Project intelligenceTDLR EABPRJB5803859Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ELEVATOR MODERNIZATION - LEE HIGH SCHOOL

1809 MARKET ST, Baytown, TX, 77520

Construction complete · Aug 2015Project Closed

ELEVATOR MODERNIZATION - LEE HIGH SCHOOL is a renovation/alteration project at 1809 MARKET ST, Baytown, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2015). The project has an estimated value of $740K.

Estimated project value
$740K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 30, 2014275 days across supplied datesAug 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    214 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77520 (Baytown)

One email per change. Unsubscribe in one click. Privacy.

ELEVATOR MODERNIZATION - LEE HIGH SCHOOL is a Renovation/Alteration project located at 1809 MARKET ST, Baytown, TX 77520 in Baytown, Texas. The project has an estimated value of $740K. PFLUGER ARCHITECTS is the property owner and PFLUGER ARCHITECTS is the design firm of record. The project was registered with TDLR on October 30, 2014.

Frequently Asked Questions

What is ELEVATOR MODERNIZATION - LEE HIGH SCHOOL?

ELEVATOR MODERNIZATION - LEE HIGH SCHOOL is a renovation/alteration project at 1809 MARKET ST in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: MODERNIZATION OF 4 EXISTING ELEVATORS.

Is ELEVATOR MODERNIZATION - LEE HIGH SCHOOL open in Baytown?

Construction on ELEVATOR MODERNIZATION - LEE HIGH SCHOOL is complete — TDLR records show the project passed its required accessibility inspection in Aug 2015. The building is finished and very likely open.

Where is ELEVATOR MODERNIZATION - LEE HIGH SCHOOL located?

ELEVATOR MODERNIZATION - LEE HIGH SCHOOL is located at 1809 MARKET ST, Baytown, TX, 77520, in Harris County.

Who is the owner or developer of ELEVATOR MODERNIZATION - LEE HIGH SCHOOL?

PFLUGER ARCHITECTS is the property owner/developer of record for ELEVATOR MODERNIZATION - LEE HIGH SCHOOL, per its TDLR project registration.

Who is the architect or design firm for ELEVATOR MODERNIZATION - LEE HIGH SCHOOL?

PFLUGER ARCHITECTS is the design firm of record for ELEVATOR MODERNIZATION - LEE HIGH SCHOOL, according to its TDLR filing.

How much does ELEVATOR MODERNIZATION - LEE HIGH SCHOOL cost and how big is it?

ELEVATOR MODERNIZATION - LEE HIGH SCHOOL has an estimated construction value of $740K, based on its TDLR filing.

Scope of Work

MODERNIZATION OF 4 EXISTING ELEVATORS.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1809 MARKET ST, Baytown, TX, 77520

29.73177, -94.98534

Watch all construction in 77520 (Baytown)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.