SPICEWORKS REMODEL 2ND FLOOR
SPICEWORKS REMODEL 2ND FLOOR is a renovation/alteration project at 3700 CAPITAL OF TX HIGHWAY STE 200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $1.3M.
๐Project Metrics
TDLR #EABPRJB5803960Project Closed
Project has been completed and closed
SPICEWORKS REMODEL 2ND FLOOR is a Renovation/Alteration project located at 3700 CAPITAL OF TX HIGHWAY STE 200, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $1.3M. HPI is the property owner and KAMPFE DE STIJL is the design firm of record. The project was registered with TDLR on October 31, 2014.
โFrequently Asked Questions
What is SPICEWORKS REMODEL 2ND FLOOR?
SPICEWORKS REMODEL 2ND FLOOR is a renovation/alteration project at 3700 CAPITAL OF TX HIGHWAY STE 200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel
Is SPICEWORKS REMODEL 2ND FLOOR open in Austin?
Construction on SPICEWORKS REMODEL 2ND FLOOR is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.
Where is SPICEWORKS REMODEL 2ND FLOOR located?
SPICEWORKS REMODEL 2ND FLOOR is located at 3700 CAPITAL OF TX HIGHWAY STE 200, Austin, TX, 78746, in Travis County.
Who is the owner or developer of SPICEWORKS REMODEL 2ND FLOOR?
HPI is the property owner/developer of record for SPICEWORKS REMODEL 2ND FLOOR, per its TDLR project registration.
Who is the architect or design firm for SPICEWORKS REMODEL 2ND FLOOR?
KAMPFE DE STIJL is the design firm of record for SPICEWORKS REMODEL 2ND FLOOR, according to its TDLR filing.
How much does SPICEWORKS REMODEL 2ND FLOOR cost and how big is it?
SPICEWORKS REMODEL 2ND FLOOR has an estimated construction value of $1.3M, based on its TDLR filing.
๐Scope of Work
Interior remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 31, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2015
๐Related Projects
๐คSame Owner
$175.9M total๐๏ธSame Design Firm
$100.6M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater Change out NG water heater like for like
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
๐Related Site Plans
City of Austin site plan approvals at this location