Project intelligenceTDLR EABPRJB5804126New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

US 59 AT A&NR RAILROAD in Lufkin, TX

US 59 AT A&NR RAILROAD, Lufkin, TX, 75901

Construction complete · Nov 2016Project Closed

US 59 AT A&NR RAILROAD is a new construction project at US 59 AT A&NR RAILROAD, Lufkin, in Angelina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2016). The project has an estimated value of $10.7M.

Estimated project value
$10.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 3, 2014743 days across supplied datesNov 15, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    684 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75901 (Lufkin)

One email per change. Unsubscribe in one click. Privacy.

US 59 AT A&NR RAILROAD is a New Construction project located at US 59 AT A&NR RAILROAD, Lufkin, TX 75901 in Lufkin, Texas. The project has an estimated value of $10.7M. TXDOT is the property owner and BROWN & GAY ENGINEERS INC is the design firm of record. The project was registered with TDLR on November 3, 2014.

Frequently Asked Questions

What is US 59 AT A&NR RAILROAD?

US 59 AT A&NR RAILROAD is a new construction project at US 59 AT A&NR RAILROAD in Lufkin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace railroad underpass

Is US 59 AT A&NR RAILROAD open in Lufkin?

Construction on US 59 AT A&NR RAILROAD is complete — TDLR records show the project passed its required accessibility inspection in Nov 2016. The building is finished and very likely open.

Where is US 59 AT A&NR RAILROAD located?

US 59 AT A&NR RAILROAD is located at US 59 AT A&NR RAILROAD, Lufkin, TX, 75901, in Angelina County.

Who is the owner or developer of US 59 AT A&NR RAILROAD?

TXDOT is the property owner/developer of record for US 59 AT A&NR RAILROAD, per its TDLR project registration.

Who is the architect or design firm for US 59 AT A&NR RAILROAD?

BROWN & GAY ENGINEERS INC is the design firm of record for US 59 AT A&NR RAILROAD, according to its TDLR filing.

How much does US 59 AT A&NR RAILROAD cost and how big is it?

US 59 AT A&NR RAILROAD has an estimated construction value of $10.7M, based on its TDLR filing.

Scope of Work

Replace railroad underpass

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

US 59 AT A&NR RAILROAD, Lufkin, TX, 75901

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75901 (Lufkin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.