JUNIPER
JUNIPER is a renovation/alteration project at 2400 E CESAR CHAVEZ Unit 304, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2015). The project has an estimated value of $437K.
๐Project Metrics
TDLR #EABPRJB5805627Project Closed
Project has been completed and closed
JUNIPER is a Renovation/Alteration project located at 2400 E CESAR CHAVEZ Unit 304, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $437K. PETER BARLIN is the property owner and SANDERS ARCHITECTURE is the design firm of record. The project was registered with TDLR on November 26, 2014.
โFrequently Asked Questions
What is JUNIPER?
JUNIPER is a renovation/alteration project at 2400 E CESAR CHAVEZ Unit 304 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build out of existing warehouse structure. Conversion of warehouse to restaurant.
Is JUNIPER open in Austin?
Construction on JUNIPER is complete โ TDLR records show the project passed its required accessibility inspection in May 2015. The building is finished and very likely open.
Where is JUNIPER located?
JUNIPER is located at 2400 E CESAR CHAVEZ Unit 304, Austin, TX, 78702, in Travis County.
Who is the owner or developer of JUNIPER?
PETER BARLIN is the property owner/developer of record for JUNIPER, per its TDLR project registration.
Who is the architect or design firm for JUNIPER?
SANDERS ARCHITECTURE is the design firm of record for JUNIPER, according to its TDLR filing.
How much does JUNIPER cost and how big is it?
JUNIPER has an estimated construction value of $437K, based on its TDLR filing.
๐Scope of Work
Interior build out of existing warehouse structure. Conversion of warehouse to restaurant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 26, 2014
Review Complete
Inspection Complete
Closed
May 1, 2015
๐Related Projects
๐คSame Owner
$787K total๐๏ธSame Design Firm
$800K total๐Related City Permits
Building permits found at or near this location
Construct 3 new driveway approaches of 80.5 FT (26.8+ 26.8+ 26.9) and sidewalk of 693 LF and curb & gutter of 50 FT. SP-2024-0310CX 2025 038126 000 00 SSI Phase 3- Sheet 6- Closure allowed for 2 Weeks
Foundation Repair
Commercial rooftop Solar installation 770.18 kw DC.
Express: Foundation repair
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location