DR. CHRIS BLUME
DR. CHRIS BLUME is a renovation/alteration project at 12710 GRANT ROAD, Cypress, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2015). The project has an estimated value of $170K.
๐Project Metrics
TDLR #EABPRJB5806452Project Closed
Project has been completed and closed
DR. CHRIS BLUME is a Renovation/Alteration project located at 12710 GRANT ROAD, Cypress, TX 77429 in Cypress, Texas. The project has an estimated value of $170K. RIZK PROPERTIES is the property owner and RJG DESIGN STUDIO is the design firm of record. The project was registered with TDLR on December 11, 2014.
โFrequently Asked Questions
What is DR. CHRIS BLUME?
DR. CHRIS BLUME is a renovation/alteration project at 12710 GRANT ROAD in Cypress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build out for Dental office.
Is DR. CHRIS BLUME open in Cypress?
Construction on DR. CHRIS BLUME is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2015. The building is finished and very likely open.
Where is DR. CHRIS BLUME located?
DR. CHRIS BLUME is located at 12710 GRANT ROAD, Cypress, TX, 77429, in Harris County.
Who is the owner or developer of DR. CHRIS BLUME?
RIZK PROPERTIES is the property owner/developer of record for DR. CHRIS BLUME, per its TDLR project registration.
Who is the architect or design firm for DR. CHRIS BLUME?
RJG DESIGN STUDIO is the design firm of record for DR. CHRIS BLUME, according to its TDLR filing.
How much does DR. CHRIS BLUME cost and how big is it?
DR. CHRIS BLUME has an estimated construction value of $170K, based on its TDLR filing.
๐Scope of Work
Build out for Dental office.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 11, 2014
Review Complete
Inspection Complete
Closed
Feb 1, 2015