K-W OFFICE SPACE
K-W OFFICE SPACE is a renovation/alteration project at 320 BARNES DRIVE, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2015). The project has an estimated value of $386K.
๐Project Metrics
TDLR #EABPRJB5809998Project Closed
Project has been completed and closed
K-W OFFICE SPACE is a Renovation/Alteration project located at 320 BARNES DRIVE, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $386K. JAMES H. KELLEY is the property owner. The project was registered with TDLR on February 13, 2015.
โFrequently Asked Questions
What is K-W OFFICE SPACE?
K-W OFFICE SPACE is a renovation/alteration project at 320 BARNES DRIVE in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Finish Out
Is K-W OFFICE SPACE open in San Marcos?
Construction on K-W OFFICE SPACE is complete โ TDLR records show the project passed its required accessibility inspection in May 2015. The building is finished and very likely open.
Where is K-W OFFICE SPACE located?
K-W OFFICE SPACE is located at 320 BARNES DRIVE, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of K-W OFFICE SPACE?
JAMES H. KELLEY is the property owner/developer of record for K-W OFFICE SPACE, per its TDLR project registration.
How much does K-W OFFICE SPACE cost and how big is it?
K-W OFFICE SPACE has an estimated construction value of $386K, based on its TDLR filing.
๐Scope of Work
Tenant Finish Out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 13, 2015
Review Complete
Inspection Complete
Closed
May 1, 2015
๐Related Projects
๐Related City Permits
Building permits found at or near this location
BAUS: GSE Renovation - New Triturator Wash Bay.
ePlan: Residential Expedited Review - Addition/Remodel existing 1-Story Single Family Res. to 2-story [3bed 2bath] with Attached Garage work to include interior remodel 1st and 2nd floor additions.
Replacement of complete existing central heat and air system with or without duct work HVAC replacement
Main disconnect was damaged. Meter was pulled so disconnect can be replaced. We need a permit so we can get an inspection. disconnect was changed with same size and type disconnect.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 01-2062