Funding type
This project is privately funded, on private land for private use.
MORRIS INTERIOR BUILD OUT in Houston, TX
1001 FANNIN STREET STE. 4000, Houston, TX, 77002
MORRIS INTERIOR BUILD OUT is a renovation/alteration project at 1001 FANNIN STREET STE. 4000, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2015). The project has an estimated value of $1.5M.
- Estimated project value
- $1.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
30 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
91 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77002 (Houston)
One email per change. Unsubscribe in one click. Privacy.
MORRIS INTERIOR BUILD OUT is a Renovation/Alteration project located at 1001 FANNIN STREET STE. 4000, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $1.5M. CBRE is the property owner and MORRIS ARCHITECTS is the design firm of record. The project was registered with TDLR on March 2, 2015.
Frequently Asked Questions
What is MORRIS INTERIOR BUILD OUT?
MORRIS INTERIOR BUILD OUT is a renovation/alteration project at 1001 FANNIN STREET STE. 4000 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of the 40th floor to update finishes throughout and re-configure offices.
Is MORRIS INTERIOR BUILD OUT open in Houston?
Construction on MORRIS INTERIOR BUILD OUT is complete — TDLR records show the project passed its required accessibility inspection in Jul 2015. The building is finished and very likely open.
Where is MORRIS INTERIOR BUILD OUT located?
MORRIS INTERIOR BUILD OUT is located at 1001 FANNIN STREET STE. 4000, Houston, TX, 77002, in Harris County.
Who is the owner or developer of MORRIS INTERIOR BUILD OUT?
CBRE is the property owner/developer of record for MORRIS INTERIOR BUILD OUT, per its TDLR project registration.
Who is the architect or design firm for MORRIS INTERIOR BUILD OUT?
MORRIS ARCHITECTS is the design firm of record for MORRIS INTERIOR BUILD OUT, according to its TDLR filing.
How much does MORRIS INTERIOR BUILD OUT cost and how big is it?
MORRIS INTERIOR BUILD OUT has an estimated construction value of $1.5M, based on its TDLR filing.
Scope of Work
Renovation of the 40th floor to update finishes throughout and re-configure offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1001 FANNIN STREET STE. 4000, Houston, TX, 77002
Related Projects
Same Owner
$715.0M totalRelated City Permits
Building permits found at or near this location
CREATE NEW 750 S/F 47TH FLOOR (IT) ROOM 1-50-1-B-A SP/FA 2021 IBC.
Watch all construction in 77002 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.