Project intelligenceTDLR EABPRJB5811277Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

PINEMONT SOC-HOLLISTER DISPOSITION

7930 PINEMONT, Houston, TX, 77040

Construction complete · Oct 2015Project Closed

PINEMONT SOC-HOLLISTER DISPOSITION is a renovation/alteration project at 7930 PINEMONT, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2015). The project has an estimated value of $1.0M.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 6, 2015209 days across supplied datesOct 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    87 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77040 (Houston)

One email per change. Unsubscribe in one click. Privacy.

PINEMONT SOC-HOLLISTER DISPOSITION is a Renovation/Alteration project located at 7930 PINEMONT, Houston, TX 77040 in Houston, Texas. The project has an estimated value of $1.0M. AT&T CORPORATE REAL ESTATE is the property owner and C SIX ARCHITECTURE LLC is the design firm of record. The project was registered with TDLR on March 6, 2015.

Frequently Asked Questions

What is PINEMONT SOC-HOLLISTER DISPOSITION?

PINEMONT SOC-HOLLISTER DISPOSITION is a renovation/alteration project at 7930 PINEMONT in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: BLDG DEMO, SITE GRADING & DRAINAGE IMPROVEMENT,PAVEMENTREPAIR,NEW SITE LIGHTING, INSTALLATION OF VAR175

Is PINEMONT SOC-HOLLISTER DISPOSITION open in Houston?

Construction on PINEMONT SOC-HOLLISTER DISPOSITION is complete — TDLR records show the project passed its required accessibility inspection in Oct 2015. The building is finished and very likely open.

Where is PINEMONT SOC-HOLLISTER DISPOSITION located?

PINEMONT SOC-HOLLISTER DISPOSITION is located at 7930 PINEMONT, Houston, TX, 77040, in Harris County.

Who is the owner or developer of PINEMONT SOC-HOLLISTER DISPOSITION?

AT&T CORPORATE REAL ESTATE is the property owner/developer of record for PINEMONT SOC-HOLLISTER DISPOSITION, per its TDLR project registration.

Who is the architect or design firm for PINEMONT SOC-HOLLISTER DISPOSITION?

C SIX ARCHITECTURE LLC is the design firm of record for PINEMONT SOC-HOLLISTER DISPOSITION, according to its TDLR filing.

How much does PINEMONT SOC-HOLLISTER DISPOSITION cost and how big is it?

PINEMONT SOC-HOLLISTER DISPOSITION has an estimated construction value of $1.0M, based on its TDLR filing.

Scope of Work

BLDG DEMO, SITE GRADING & DRAINAGE IMPROVEMENT,PAVEMENTREPAIR,NEW SITE LIGHTING, INSTALLATION OF VAR175

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7930 PINEMONT, Houston, TX, 77040

29.84127, -95.51090

Watch all construction in 77040 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.