700 LAVACA 13TH FLOOR
700 LAVACA 13TH FLOOR is a renovation/alteration project at 700 LAVACA 13th Floor, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2015). The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB5811401Project Closed
Project has been completed and closed
700 LAVACA 13TH FLOOR is a Renovation/Alteration project located at 700 LAVACA 13th Floor, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $1.0M. TRAVIS COUNTY is the property owner and TRAVIS COUNTY is the design firm of record. The project was registered with TDLR on March 9, 2015.
โFrequently Asked Questions
What is 700 LAVACA 13TH FLOOR?
700 LAVACA 13TH FLOOR is a renovation/alteration project at 700 LAVACA 13th Floor in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation - office function 13th Floor
Is 700 LAVACA 13TH FLOOR open in Austin?
Construction on 700 LAVACA 13TH FLOOR is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2015. The building is finished and very likely open.
Where is 700 LAVACA 13TH FLOOR located?
700 LAVACA 13TH FLOOR is located at 700 LAVACA 13th Floor, Austin, TX, 78701, in Travis County.
Who is the owner or developer of 700 LAVACA 13TH FLOOR?
TRAVIS COUNTY is the property owner/developer of record for 700 LAVACA 13TH FLOOR, per its TDLR project registration.
Who is the architect or design firm for 700 LAVACA 13TH FLOOR?
TRAVIS COUNTY is the design firm of record for 700 LAVACA 13TH FLOOR, according to its TDLR filing.
How much does 700 LAVACA 13TH FLOOR cost and how big is it?
700 LAVACA 13TH FLOOR has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
Interior Renovation - office function 13th Floor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 9, 2015
Review Complete
Inspection Complete
Closed
Aug 1, 2015
๐Related Projects
๐คSame Owner
$224.8M total๐๏ธSame Design Firm
$224.8M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacing Exst. Elec. Srv Only
Commercial Gas Test
Install New Water Chiller (Comm)
Install New Water Chiller (Comm)
Change Out Ballast Commercial
๐Related Site Plans
City of Austin site plan approvals at this location