Project intelligenceTDLR EABPRJB5812471Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

GCISD | GHS BB BLEACHER & FILM DECK RENO in Grapevine, TX

3223 MUSTANG DR, Grapevine, TX, 76051

Construction complete · Mar 2015Project Closed

GCISD | GHS BB BLEACHER & FILM DECK RENO is a renovation/alteration project at 3223 MUSTANG DR, Grapevine, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2015). The project has an estimated value of $73K.

Estimated project value
$73K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
0 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 1, 201524 days across supplied datesMar 25, 2015

4 timeline dates shown.

  1. Project closed · TDLR filing

    The project record was closed in TDLR.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76051 (Grapevine)

One email per change. Unsubscribe in one click. Privacy.

GCISD | GHS BB BLEACHER & FILM DECK RENO is a Renovation/Alteration project located at 3223 MUSTANG DR, Grapevine, TX 76051 in Grapevine, Texas. The project has an estimated value of $73K. GRAPEVINE-COLLEYVILLE ISD is the property owner and HUCKABEE & ASSOCIATES INC is the design firm of record. The project was registered with TDLR on March 25, 2015.

Frequently Asked Questions

What is GCISD | GHS BB BLEACHER & FILM DECK RENO?

GCISD | GHS BB BLEACHER & FILM DECK RENO is a renovation/alteration project at 3223 MUSTANG DR in Grapevine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to bleachers and film deck at baseball fieldfor Grapevine High School.

Is GCISD | GHS BB BLEACHER & FILM DECK RENO open in Grapevine?

Construction on GCISD | GHS BB BLEACHER & FILM DECK RENO is complete — TDLR records show the project passed its required accessibility inspection in Mar 2015. The building is finished and very likely open.

Where is GCISD | GHS BB BLEACHER & FILM DECK RENO located?

GCISD | GHS BB BLEACHER & FILM DECK RENO is located at 3223 MUSTANG DR, Grapevine, TX, 76051, in Tarrant County.

Who is the owner or developer of GCISD | GHS BB BLEACHER & FILM DECK RENO?

GRAPEVINE-COLLEYVILLE ISD is the property owner/developer of record for GCISD | GHS BB BLEACHER & FILM DECK RENO, per its TDLR project registration.

Who is the architect or design firm for GCISD | GHS BB BLEACHER & FILM DECK RENO?

HUCKABEE & ASSOCIATES INC is the design firm of record for GCISD | GHS BB BLEACHER & FILM DECK RENO, according to its TDLR filing.

How much does GCISD | GHS BB BLEACHER & FILM DECK RENO cost and how big is it?

GCISD | GHS BB BLEACHER & FILM DECK RENO has an estimated construction value of $73K, based on its TDLR filing.

Scope of Work

Renovations to bleachers and film deck at baseball fieldfor Grapevine High School.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3223 MUSTANG DR, Grapevine, TX, 76051

Loading location map…
32.91884, -97.11786

Watch all construction in 76051 (Grapevine)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Grapevine?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.