PROJECT #3 - ALTER. TO THE SURGERY DEPT.
PROJECT #3 - ALTER. TO THE SURGERY DEPT. is a renovation/alteration project at 2600 ST. MICHAEL DRIVE, Texarkana, in Bowie County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $1.7M.
๐Project Metrics
TDLR #EABPRJB5812885Project Closed
Project has been completed and closed
PROJECT #3 - ALTER. TO THE SURGERY DEPT. is a Renovation/Alteration project located at 2600 ST. MICHAEL DRIVE, Texarkana, TX 75501 in Texarkana, Texas. The project has an estimated value of $1.7M. CHRISTUS HEALTH SYSTEMS is the property owner and DAVID R. LAMB ARCHITECT is the design firm of record. The project was registered with TDLR on March 31, 2015.
โFrequently Asked Questions
What is PROJECT #3 - ALTER. TO THE SURGERY DEPT.?
PROJECT #3 - ALTER. TO THE SURGERY DEPT. is a renovation/alteration project at 2600 ST. MICHAEL DRIVE in Texarkana, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Alterations to create new staff locker rooms and a Hybrid Operating Room in the Surgery Area.
Is PROJECT #3 - ALTER. TO THE SURGERY DEPT. open in Texarkana?
Construction on PROJECT #3 - ALTER. TO THE SURGERY DEPT. is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.
Where is PROJECT #3 - ALTER. TO THE SURGERY DEPT. located?
PROJECT #3 - ALTER. TO THE SURGERY DEPT. is located at 2600 ST. MICHAEL DRIVE, Texarkana, TX, 75501, in Bowie County.
Who is the owner or developer of PROJECT #3 - ALTER. TO THE SURGERY DEPT.?
CHRISTUS HEALTH SYSTEMS is the property owner/developer of record for PROJECT #3 - ALTER. TO THE SURGERY DEPT., per its TDLR project registration.
Who is the architect or design firm for PROJECT #3 - ALTER. TO THE SURGERY DEPT.?
DAVID R. LAMB ARCHITECT is the design firm of record for PROJECT #3 - ALTER. TO THE SURGERY DEPT., according to its TDLR filing.
How much does PROJECT #3 - ALTER. TO THE SURGERY DEPT. cost and how big is it?
PROJECT #3 - ALTER. TO THE SURGERY DEPT. has an estimated construction value of $1.7M, based on its TDLR filing.
๐Scope of Work
Alterations to create new staff locker rooms and a Hybrid Operating Room in the Surgery Area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 31, 2015
Review Complete
Inspection Complete
Closed
Dec 1, 2015