WHITESTONE BREWERY
WHITESTONE BREWERY is a renovation/alteration project at 601 E. WHITESTONE BLVD Suite 500, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2015). The project has an estimated value of $300K.
๐Project Metrics
TDLR #EABPRJB5813198Project Closed
Project has been completed and closed
WHITESTONE BREWERY is a Renovation/Alteration project located at 601 E. WHITESTONE BLVD Suite 500, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $300K. RYAN ANGLEN is the property owner and OPA DESIGN STUDIO INC. is the design firm of record. The project was registered with TDLR on April 6, 2015.
โFrequently Asked Questions
What is WHITESTONE BREWERY?
WHITESTONE BREWERY is a renovation/alteration project at 601 E. WHITESTONE BLVD Suite 500 in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Brewery with bar and open seating. Storage mezzanine located in the production space.
Is WHITESTONE BREWERY open in Cedar Park?
Construction on WHITESTONE BREWERY is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2015. The building is finished and very likely open.
Where is WHITESTONE BREWERY located?
WHITESTONE BREWERY is located at 601 E. WHITESTONE BLVD Suite 500, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of WHITESTONE BREWERY?
RYAN ANGLEN is the property owner/developer of record for WHITESTONE BREWERY, per its TDLR project registration.
Who is the architect or design firm for WHITESTONE BREWERY?
OPA DESIGN STUDIO INC. is the design firm of record for WHITESTONE BREWERY, according to its TDLR filing.
How much does WHITESTONE BREWERY cost and how big is it?
WHITESTONE BREWERY has an estimated construction value of $300K, based on its TDLR filing.
๐Scope of Work
Brewery with bar and open seating. Storage mezzanine located in the production space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 6, 2015
Review Complete
Inspection Complete
Closed
Aug 1, 2015
๐Related Projects
๐๏ธSame Design Firm
$70.6M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Interior Remodel of kitchen bathrooms and living areas half bath addition conversion of porch into sunroom
Express: roof repair roof decking replacement
Express- Foundation repair. Install 18 total pilings
Removal of tanked water heater and replacing with tankless water heater.
Upgrade to a 200 amps No work related to interior remodel permit meter upgrade only.