Funding type
This project is privately funded, on private land for private use.
AUTUMN WIND MINEOLA II
135 AUTUMN WIND COURT, Mineola, TX, 75773
AUTUMN WIND MINEOLA II is a additions to existing building project at 135 AUTUMN WIND COURT, Mineola, in Wood County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2016). The project has an estimated value of $1.2M.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
17 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
366 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75773 (Mineola)
One email per change. Unsubscribe in one click. Privacy.
AUTUMN WIND MINEOLA II is a Additions to Existing Building project located at 135 AUTUMN WIND COURT, Mineola, TX 75773 in Mineola, Texas. The project has an estimated value of $1.2M. CMM MINEOLA LLC is the property owner and WOMACK + HAMPTON ARCHITECTS LLC is the design firm of record. The project was registered with TDLR on April 14, 2015.
Frequently Asked Questions
What is AUTUMN WIND MINEOLA II?
AUTUMN WIND MINEOLA II is a additions to existing building project at 135 AUTUMN WIND COURT in Mineola, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 18 unit Assisted Living addition to existing 64 unit facility.
Is AUTUMN WIND MINEOLA II open in Mineola?
Construction on AUTUMN WIND MINEOLA II is complete — TDLR records show the project passed its required accessibility inspection in May 2016. The building is finished and very likely open.
Where is AUTUMN WIND MINEOLA II located?
AUTUMN WIND MINEOLA II is located at 135 AUTUMN WIND COURT, Mineola, TX, 75773, in Wood County.
Who is the owner or developer of AUTUMN WIND MINEOLA II?
CMM MINEOLA LLC is the property owner/developer of record for AUTUMN WIND MINEOLA II, per its TDLR project registration.
Who is the architect or design firm for AUTUMN WIND MINEOLA II?
WOMACK + HAMPTON ARCHITECTS LLC is the design firm of record for AUTUMN WIND MINEOLA II, according to its TDLR filing.
How much does AUTUMN WIND MINEOLA II cost and how big is it?
AUTUMN WIND MINEOLA II has an estimated construction value of $1.2M, based on its TDLR filing.
Scope of Work
18 unit Assisted Living addition to existing 64 unit facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
135 AUTUMN WIND COURT, Mineola, TX, 75773
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$5.7M totalSame Design Firm
$2.38B totalWatch all construction in 75773 (Mineola)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mineola?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.