Project intelligenceTDLR EABPRJB5813796Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

PAVING IMPROVEMENTS STREEG GROUP 12-461 in Dallas, TX

FROM JERDEN LN. TO PEMBROKE AV, Dallas, TX, 75203

Construction complete · Apr 2015Project Closed

PAVING IMPROVEMENTS STREEG GROUP 12-461 is a renovation/alteration project at FROM JERDEN LN. TO PEMBROKE AV, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $536K.

Estimated project value
$536K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
0 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 1, 201513 days across supplied datesApr 14, 2015

4 timeline dates shown.

  1. Project closed · TDLR filing

    The project record was closed in TDLR.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75203 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

PAVING IMPROVEMENTS STREEG GROUP 12-461 is a Renovation/Alteration project located at FROM JERDEN LN. TO PEMBROKE AV, Dallas, TX 75203 in Dallas, Texas. The project has an estimated value of $536K. CITY OF DALLAS PUBLIC WORKS DEPARTMENT is the property owner and GRESHAM SMITH AND PARTNERS is the design firm of record. The project was registered with TDLR on April 14, 2015.

Frequently Asked Questions

What is PAVING IMPROVEMENTS STREEG GROUP 12-461?

PAVING IMPROVEMENTS STREEG GROUP 12-461 is a renovation/alteration project at FROM JERDEN LN. TO PEMBROKE AV in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal and replacement of existing roadway, driveways,and sidewalks on Rockwood Street from Jerden Lane to Pem

Is PAVING IMPROVEMENTS STREEG GROUP 12-461 open in Dallas?

Construction on PAVING IMPROVEMENTS STREEG GROUP 12-461 is complete — TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.

Where is PAVING IMPROVEMENTS STREEG GROUP 12-461 located?

PAVING IMPROVEMENTS STREEG GROUP 12-461 is located at FROM JERDEN LN. TO PEMBROKE AV, Dallas, TX, 75203, in Dallas County.

Who is the owner or developer of PAVING IMPROVEMENTS STREEG GROUP 12-461?

CITY OF DALLAS PUBLIC WORKS DEPARTMENT is the property owner/developer of record for PAVING IMPROVEMENTS STREEG GROUP 12-461, per its TDLR project registration.

Who is the architect or design firm for PAVING IMPROVEMENTS STREEG GROUP 12-461?

GRESHAM SMITH AND PARTNERS is the design firm of record for PAVING IMPROVEMENTS STREEG GROUP 12-461, according to its TDLR filing.

How much does PAVING IMPROVEMENTS STREEG GROUP 12-461 cost and how big is it?

PAVING IMPROVEMENTS STREEG GROUP 12-461 has an estimated construction value of $536K, based on its TDLR filing.

Scope of Work

Removal and replacement of existing roadway, driveways,and sidewalks on Rockwood Street from Jerden Lane to Pem

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

FROM JERDEN LN. TO PEMBROKE AV, Dallas, TX, 75203

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75203 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.