Project intelligenceTDLR EABPRJB5813833New Construction
Funding type

This project is privately funded, on private land for private use.

FIRST ASSEMBLY OF GOD in La Porte, TX

316 E. FAIRMONT PARKWAY, La Porte, TX, 77571

Construction complete · Dec 2017Project Closed

FIRST ASSEMBLY OF GOD is a new construction project at 316 E. FAIRMONT PARKWAY, La Porte, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2017). The project has an estimated value of $2.5M.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 15, 2015961 days across supplied datesDec 1, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    914 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77571 (La Porte)

One email per change. Unsubscribe in one click. Privacy.

FIRST ASSEMBLY OF GOD is a New Construction project located at 316 E. FAIRMONT PARKWAY, La Porte, TX 77571 in La Porte, Texas. The project has an estimated value of $2.5M. FIRST ASSEMBLY OF GOD is the property owner and CHURCH DESIGNBUILD SERVICES INC is the design firm of record. The project was registered with TDLR on April 15, 2015.

Frequently Asked Questions

What is FIRST ASSEMBLY OF GOD?

FIRST ASSEMBLY OF GOD is a new construction project at 316 E. FAIRMONT PARKWAY in La Porte, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 16,000 s.f. Worship/Classroom/Office building

Is FIRST ASSEMBLY OF GOD open in La Porte?

Construction on FIRST ASSEMBLY OF GOD is complete — TDLR records show the project passed its required accessibility inspection in Dec 2017. The building is finished and very likely open.

Where is FIRST ASSEMBLY OF GOD located?

FIRST ASSEMBLY OF GOD is located at 316 E. FAIRMONT PARKWAY, La Porte, TX, 77571, in Harris County.

Who is the owner or developer of FIRST ASSEMBLY OF GOD?

FIRST ASSEMBLY OF GOD is the property owner/developer of record for FIRST ASSEMBLY OF GOD, per its TDLR project registration.

Who is the architect or design firm for FIRST ASSEMBLY OF GOD?

CHURCH DESIGNBUILD SERVICES INC is the design firm of record for FIRST ASSEMBLY OF GOD, according to its TDLR filing.

How much does FIRST ASSEMBLY OF GOD cost and how big is it?

FIRST ASSEMBLY OF GOD has an estimated construction value of $2.5M, based on its TDLR filing.

Scope of Work

16,000 s.f. Worship/Classroom/Office building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

316 E. FAIRMONT PARKWAY, La Porte, TX, 77571

Loading location map…
29.65248, -95.02131

Watch all construction in 77571 (La Porte)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in La Porte?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.