FB MUD 57 DISTRICT WIDE TRAIL ENHANCE in Katy, TX

PINE MILL RANCH DRIVE AND Winding Point Lane, Katy, TX, 77494

Construction complete · Mar 2016Project Closed

FB MUD 57 DISTRICT WIDE TRAIL ENHANCE is a new construction project at PINE MILL RANCH DRIVE AND Winding Point Lane, Katy, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2016). The project has an estimated value of $650K.

Estimated project value
$650K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 15, 2015350 days across supplied datesMar 30, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    303 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77494 (Katy)

One email per change. Unsubscribe in one click. Privacy.

FB MUD 57 DISTRICT WIDE TRAIL ENHANCE is a New Construction project located at PINE MILL RANCH DRIVE AND Winding Point Lane, Katy, TX 77494 in Katy, Texas. The project has an estimated value of $650K. KGA DEFOREST DESIGN is the property owner. The project was registered with TDLR on April 15, 2015.

Frequently Asked Questions

What is FB MUD 57 DISTRICT WIDE TRAIL ENHANCE?

FB MUD 57 DISTRICT WIDE TRAIL ENHANCE is a new construction project at PINE MILL RANCH DRIVE AND Winding Point Lane in Katy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk, Fitness Stations, Site Furniture

Is FB MUD 57 DISTRICT WIDE TRAIL ENHANCE open in Katy?

Construction on FB MUD 57 DISTRICT WIDE TRAIL ENHANCE is complete — TDLR records show the project passed its required accessibility inspection in Mar 2016. The building is finished and very likely open.

Where is FB MUD 57 DISTRICT WIDE TRAIL ENHANCE located?

FB MUD 57 DISTRICT WIDE TRAIL ENHANCE is located at PINE MILL RANCH DRIVE AND Winding Point Lane, Katy, TX, 77494, in Harris County.

Who is the owner or developer of FB MUD 57 DISTRICT WIDE TRAIL ENHANCE?

KGA DEFOREST DESIGN is the property owner/developer of record for FB MUD 57 DISTRICT WIDE TRAIL ENHANCE, per its TDLR project registration.

How much does FB MUD 57 DISTRICT WIDE TRAIL ENHANCE cost and how big is it?

FB MUD 57 DISTRICT WIDE TRAIL ENHANCE has an estimated construction value of $650K, based on its TDLR filing.

Scope of Work

Sidewalk, Fitness Stations, Site Furniture

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

PINE MILL RANCH DRIVE AND Winding Point Lane, Katy, TX, 77494

Loading location map…
29.72716, -95.83482

Watch all construction in 77494 (Katy)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.