SPUR 6
SPUR 6 is a renovation/alteration project at AT SH 20 (DONIPHAN), Anthony, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2016). The project has an estimated value of $239K.
๐Project Metrics
TDLR #EABPRJB5817705Project Closed
Project has been completed and closed
SPUR 6 is a Renovation/Alteration project located at AT SH 20 (DONIPHAN), Anthony, TX 79901 in Anthony, Texas. The project has an estimated value of $239K. TXDOT DISTRICT: EL PASO is the property owner and TXDOT is the design firm of record. The project was registered with TDLR on June 11, 2015.
โFrequently Asked Questions
What is SPUR 6?
SPUR 6 is a renovation/alteration project at AT SH 20 (DONIPHAN) in Anthony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installing/replacing sidewalk, driveways and illumination along the Spur 6 (Wildcat Dr) corridor from SH 20 (Don
Is SPUR 6 open in Anthony?
Construction on SPUR 6 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2016. The building is finished and very likely open.
Where is SPUR 6 located?
SPUR 6 is located at AT SH 20 (DONIPHAN), Anthony, TX, 79901, in El Paso County.
Who is the owner or developer of SPUR 6?
TXDOT DISTRICT: EL PASO is the property owner/developer of record for SPUR 6, per its TDLR project registration.
Who is the architect or design firm for SPUR 6?
TXDOT is the design firm of record for SPUR 6, according to its TDLR filing.
How much does SPUR 6 cost and how big is it?
SPUR 6 has an estimated construction value of $239K, based on its TDLR filing.
๐Scope of Work
Installing/replacing sidewalk, driveways and illumination along the Spur 6 (Wildcat Dr) corridor from SH 20 (Don
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 11, 2015
Review Complete
Inspection Complete
Closed
Feb 1, 2016