REVERSE OSMOSIS SYSTEM FOR PBC is a renovation/alteration project at 6100 NE INTERSTATE 410 LOOP, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2015). The project has an estimated value of $1.2M.
Project has been completed and closed
REVERSE OSMOSIS SYSTEM FOR PBC is a Renovation/Alteration project located at 6100 NE INTERSTATE 410 LOOP, San Antonio, TX 78218 in San Antonio, Texas. The project has an estimated value of $1.2M. PEPSI COLA SOUTH INC is the property owner and CHA INC. is the design firm of record. The project was registered with TDLR on June 11, 2015.
REVERSE OSMOSIS SYSTEM FOR PBC is a renovation/alteration project at 6100 NE INTERSTATE 410 LOOP in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations required to replace existing water treatmentsystem with new reverse osmosis system
Construction on REVERSE OSMOSIS SYSTEM FOR PBC is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2015. The building is finished and very likely open.
REVERSE OSMOSIS SYSTEM FOR PBC is located at 6100 NE INTERSTATE 410 LOOP, San Antonio, TX, 78218, in Bexar County.
PEPSI COLA SOUTH INC is the property owner/developer of record for REVERSE OSMOSIS SYSTEM FOR PBC, per its TDLR project registration.
CHA INC. is the design firm of record for REVERSE OSMOSIS SYSTEM FOR PBC, according to its TDLR filing.
REVERSE OSMOSIS SYSTEM FOR PBC has an estimated construction value of $1.2M, based on its TDLR filing.
Renovations required to replace existing water treatmentsystem with new reverse osmosis system
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 11, 2015
Review Complete
Inspection Complete
Closed
Sep 1, 2015