Project intelligenceTDLR EABPRJB5820458Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

E.R. FOR CHRISTUS HEALTH CARMEL CANYON in San Antonio, TX

11823 CULEBRA RD., San Antonio, TX, 78253

Construction complete · Oct 2016Project Closed

E.R. FOR CHRISTUS HEALTH CARMEL CANYON is a renovation/alteration project at 11823 CULEBRA RD., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2016). The project has an estimated value of $225K.

Estimated project value
$225K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 22, 2015437 days across supplied datesOct 1, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    71 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    366 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78253 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

E.R. FOR CHRISTUS HEALTH CARMEL CANYON is a Renovation/Alteration project located at 11823 CULEBRA RD., San Antonio, TX 78253 in San Antonio, Texas. The project has an estimated value of $225K. TAFT SELF STORAGE LP is the property owner and MEDESIGN ARCHITECTURAL GROUP is the design firm of record. The project was registered with TDLR on July 22, 2015.

Frequently Asked Questions

What is E.R. FOR CHRISTUS HEALTH CARMEL CANYON?

E.R. FOR CHRISTUS HEALTH CARMEL CANYON is a renovation/alteration project at 11823 CULEBRA RD. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New emergency department addition in an existing 1 storyconstruction.

Is E.R. FOR CHRISTUS HEALTH CARMEL CANYON open in San Antonio?

Construction on E.R. FOR CHRISTUS HEALTH CARMEL CANYON is complete — TDLR records show the project passed its required accessibility inspection in Oct 2016. The building is finished and very likely open.

Where is E.R. FOR CHRISTUS HEALTH CARMEL CANYON located?

E.R. FOR CHRISTUS HEALTH CARMEL CANYON is located at 11823 CULEBRA RD., San Antonio, TX, 78253, in Bexar County.

Who is the owner or developer of E.R. FOR CHRISTUS HEALTH CARMEL CANYON?

TAFT SELF STORAGE LP is the property owner/developer of record for E.R. FOR CHRISTUS HEALTH CARMEL CANYON, per its TDLR project registration.

Who is the architect or design firm for E.R. FOR CHRISTUS HEALTH CARMEL CANYON?

MEDESIGN ARCHITECTURAL GROUP is the design firm of record for E.R. FOR CHRISTUS HEALTH CARMEL CANYON, according to its TDLR filing.

How much does E.R. FOR CHRISTUS HEALTH CARMEL CANYON cost and how big is it?

E.R. FOR CHRISTUS HEALTH CARMEL CANYON has an estimated construction value of $225K, based on its TDLR filing.

Scope of Work

New emergency department addition in an existing 1 storyconstruction.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

11823 CULEBRA RD., San Antonio, TX, 78253

Location by street address

Related City Permits

Building permits found at or near this location

11823 CULEBRA RD, City of San Antonio, TX 78253

11823 CULEBRA RD

IssuedOn Premise SignJul 2026
SAT-SIG-OPS-PMT26-21501079
11823 CULEBRA RD, City of San Antonio, TX 78253

11823 CULEBRA RD

IssuedOn Premise SignDec 2025
SAT-SIG-OPS-PMT25-21501798

Watch all construction in 78253 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.