SAMC 3RD FLOOR RENOVATION PHASE 2
SAMC 3RD FLOOR RENOVATION PHASE 2 is a renovation/alteration project at 901 W. BEN WHITE BLVD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2016). The project has an estimated value of $1.4M.
๐Project Metrics
TDLR #EABPRJB5820753Project Closed
Project has been completed and closed
SAMC 3RD FLOOR RENOVATION PHASE 2 is a Renovation/Alteration project located at 901 W. BEN WHITE BLVD., Austin, TX 78704 in Austin, Texas. The project has an estimated value of $1.4M. ST. DAVID'S SOUTH AUSTIN MEDICAL CENTER is the property owner and H+SP is the design firm of record. The project was registered with TDLR on July 27, 2015.
โFrequently Asked Questions
What is SAMC 3RD FLOOR RENOVATION PHASE 2?
SAMC 3RD FLOOR RENOVATION PHASE 2 is a renovation/alteration project at 901 W. BEN WHITE BLVD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Phase 2 of the third floor including patient rooms, patient toilets, administrative area, new finishes, some new
Is SAMC 3RD FLOOR RENOVATION PHASE 2 open in Austin?
Construction on SAMC 3RD FLOOR RENOVATION PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2016. The building is finished and very likely open.
Where is SAMC 3RD FLOOR RENOVATION PHASE 2 located?
SAMC 3RD FLOOR RENOVATION PHASE 2 is located at 901 W. BEN WHITE BLVD., Austin, TX, 78704, in Travis County.
Who is the owner or developer of SAMC 3RD FLOOR RENOVATION PHASE 2?
ST. DAVID'S SOUTH AUSTIN MEDICAL CENTER is the property owner/developer of record for SAMC 3RD FLOOR RENOVATION PHASE 2, per its TDLR project registration.
Who is the architect or design firm for SAMC 3RD FLOOR RENOVATION PHASE 2?
H+SP is the design firm of record for SAMC 3RD FLOOR RENOVATION PHASE 2, according to its TDLR filing.
How much does SAMC 3RD FLOOR RENOVATION PHASE 2 cost and how big is it?
SAMC 3RD FLOOR RENOVATION PHASE 2 has an estimated construction value of $1.4M, based on its TDLR filing.
๐Scope of Work
Phase 2 of the third floor including patient rooms, patient toilets, administrative area, new finishes, some new
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 27, 2015
Review Complete
Inspection Complete
Closed
Feb 1, 2016
๐Related Projects
๐คSame Owner
$683.7M total๐๏ธSame Design Firm
$14.3M total๐Related City Permits
Building permits found at or near this location
Express: Replace 4 existing windows - size for size
PB- New Construction 2 story SFR 4 bed 3 bath with attached garage and covered porch and patio
Replacement of an existing water heater Replace the 40-gallon natural gas water heater located in the garage attic
Interior remodel to existing business office suite. No access control. No change of use.
Upgrading the full electrical wall.