Project intelligenceTDLR EABPRJB5820941New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

LOCKHART HIGH SCHOOL TEMPORARY PORTABLE

906 CENTER STREET, Lockhart, TX, 78644

Construction complete · Aug 2015Project Closed

LOCKHART HIGH SCHOOL TEMPORARY PORTABLE is a new construction project at 906 CENTER STREET, Lockhart, in Caldwell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2015). The project has an estimated value of $59K.

Estimated project value
$59K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
0 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 29, 20153 days across supplied datesAug 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Project closed · TDLR filing

    The project record was closed in TDLR.

    3 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78644 (Lockhart)

One email per change. Unsubscribe in one click. Privacy.

LOCKHART HIGH SCHOOL TEMPORARY PORTABLE is a New Construction project located at 906 CENTER STREET, Lockhart, TX 78644 in Lockhart, Texas. The project has an estimated value of $59K. LOCKHART ISD is the property owner and RAMTECH BUILDING SYSTEMS INC. is the design firm of record. The project was registered with TDLR on July 29, 2015.

Frequently Asked Questions

What is LOCKHART HIGH SCHOOL TEMPORARY PORTABLE?

LOCKHART HIGH SCHOOL TEMPORARY PORTABLE is a new construction project at 906 CENTER STREET in Lockhart, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Placement of a temporary portable building on a High School site

Is LOCKHART HIGH SCHOOL TEMPORARY PORTABLE open in Lockhart?

Construction on LOCKHART HIGH SCHOOL TEMPORARY PORTABLE is complete — TDLR records show the project passed its required accessibility inspection in Aug 2015. The building is finished and very likely open.

Where is LOCKHART HIGH SCHOOL TEMPORARY PORTABLE located?

LOCKHART HIGH SCHOOL TEMPORARY PORTABLE is located at 906 CENTER STREET, Lockhart, TX, 78644, in Caldwell County.

Who is the owner or developer of LOCKHART HIGH SCHOOL TEMPORARY PORTABLE?

LOCKHART ISD is the property owner/developer of record for LOCKHART HIGH SCHOOL TEMPORARY PORTABLE, per its TDLR project registration.

Who is the architect or design firm for LOCKHART HIGH SCHOOL TEMPORARY PORTABLE?

RAMTECH BUILDING SYSTEMS INC. is the design firm of record for LOCKHART HIGH SCHOOL TEMPORARY PORTABLE, according to its TDLR filing.

How much does LOCKHART HIGH SCHOOL TEMPORARY PORTABLE cost and how big is it?

LOCKHART HIGH SCHOOL TEMPORARY PORTABLE has an estimated construction value of $59K, based on its TDLR filing.

Scope of Work

Placement of a temporary portable building on a High School site

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

906 CENTER STREET, Lockhart, TX, 78644

Location by street address

Watch all construction in 78644 (Lockhart)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Lockhart?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.