3200 TEXAS
3200 TEXAS is a renovation/alteration project at 3200 TEXAS, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $1.5M.
๐Project Metrics
TDLR #EABPRJB5821313Project Closed
Project has been completed and closed
3200 TEXAS is a Renovation/Alteration project located at 3200 TEXAS, Houston, TX 77003 in Houston, Texas. The project has an estimated value of $1.5M. CENTERPOINT ENERGY is the property owner and KENNETH E. ROBERTS PLLC is the design firm of record. The project was registered with TDLR on August 5, 2015.
โFrequently Asked Questions
What is 3200 TEXAS?
3200 TEXAS is a renovation/alteration project at 3200 TEXAS in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Warehouse renovation. Provide a new accessible pedestrian ramp, entry door and stair, a new fork lift ramp and p
Is 3200 TEXAS open in Houston?
Construction on 3200 TEXAS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.
Where is 3200 TEXAS located?
3200 TEXAS is located at 3200 TEXAS, Houston, TX, 77003, in Harris County.
Who is the owner or developer of 3200 TEXAS?
CENTERPOINT ENERGY is the property owner/developer of record for 3200 TEXAS, per its TDLR project registration.
Who is the architect or design firm for 3200 TEXAS?
KENNETH E. ROBERTS PLLC is the design firm of record for 3200 TEXAS, according to its TDLR filing.
How much does 3200 TEXAS cost and how big is it?
3200 TEXAS has an estimated construction value of $1.5M, based on its TDLR filing.
๐Scope of Work
Warehouse renovation. Provide a new accessible pedestrian ramp, entry door and stair, a new fork lift ramp and p
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 5, 2015
Review Complete
Inspection Complete
Closed
Dec 1, 2015