DR. PEZESHK
DR. PEZESHK is a renovation/alteration project at 4553 LOOP 1604 SUITE 1223, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $131K.
๐Project Metrics
TDLR #EABPRJB5822061Project Closed
Project has been completed and closed
DR. PEZESHK is a Renovation/Alteration project located at 4553 LOOP 1604 SUITE 1223, San Antonio, TX 78249 in San Antonio, Texas. The project has an estimated value of $131K. RIDGE, THE is the property owner and MED TECH CONSTRUCTION is the design firm of record. The project was registered with TDLR on August 17, 2015.
โFrequently Asked Questions
What is DR. PEZESHK?
DR. PEZESHK is a renovation/alteration project at 4553 LOOP 1604 SUITE 1223 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REMODEL TO A OPTICAL CLINIC.
Is DR. PEZESHK open in San Antonio?
Construction on DR. PEZESHK is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.
Where is DR. PEZESHK located?
DR. PEZESHK is located at 4553 LOOP 1604 SUITE 1223, San Antonio, TX, 78249, in Bexar County.
Who is the owner or developer of DR. PEZESHK?
RIDGE, THE is the property owner/developer of record for DR. PEZESHK, per its TDLR project registration.
Who is the architect or design firm for DR. PEZESHK?
MED TECH CONSTRUCTION is the design firm of record for DR. PEZESHK, according to its TDLR filing.
How much does DR. PEZESHK cost and how big is it?
DR. PEZESHK has an estimated construction value of $131K, based on its TDLR filing.
๐Scope of Work
REMODEL TO A OPTICAL CLINIC.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 17, 2015
Review Complete
Inspection Complete
Closed
Dec 1, 2015