ROBERT HALF INTERNATIONAL EXPANSION is a renovation/alteration project at 10801 N. MOPAC EXPY. Suite 220, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2016). The project has an estimated value of $169K.
Project has been completed and closed
ROBERT HALF INTERNATIONAL EXPANSION is a Renovation/Alteration project located at 10801 N. MOPAC EXPY. Suite 220, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $169K. PACTRUST is the property owner and WHITNEY BROWN is the design firm of record. The project was registered with TDLR on August 31, 2015.
ROBERT HALF INTERNATIONAL EXPANSION is a renovation/alteration project at 10801 N. MOPAC EXPY. Suite 220 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of existing office space.
Construction on ROBERT HALF INTERNATIONAL EXPANSION is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2016. The building is finished and very likely open.
ROBERT HALF INTERNATIONAL EXPANSION is located at 10801 N. MOPAC EXPY. Suite 220, Austin, TX, 78759, in Travis County.
PACTRUST is the property owner/developer of record for ROBERT HALF INTERNATIONAL EXPANSION, per its TDLR project registration.
WHITNEY BROWN is the design firm of record for ROBERT HALF INTERNATIONAL EXPANSION, according to its TDLR filing.
ROBERT HALF INTERNATIONAL EXPANSION has an estimated construction value of $169K, based on its TDLR filing.
Interior finish out of existing office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 31, 2015
Review Complete
Inspection Complete
Closed
Apr 1, 2016
Building permits found at or near this location
Access Control - Installing electronic locks (6 Doors)
spot repair to the sewer line in the yard next to a tree
Replacement of complete existing central heat and air system with or without duct work UPSTAIRS & DOWNSTAIRS SYSTEM CHANGE OUT
Build a 100 amp main breaker service. with a 200 amp by pass meter base to provide power to a Spectrum CCTV cabinet
Express: Foundation Repair