Project intelligenceTDLR EABPRJB6804356Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

PHASE TWO FINISH OUT

1137 LOOP 301, Sulphur Springs, TX, 75482

Construction complete · Dec 2015Project Closed

PHASE TWO FINISH OUT is a renovation/alteration project at 1137 LOOP 301, Sulphur Springs, in Hopkins County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $250K.

Estimated project value
$250K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 1, 201530 days across supplied datesDec 1, 2015

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75482 (Sulphur Springs)

One email per change. Unsubscribe in one click. Privacy.

PHASE TWO FINISH OUT is a Renovation/Alteration project located at 1137 LOOP 301, Sulphur Springs, TX 75482 in Sulphur Springs, Texas. The project has an estimated value of $250K. PARIS JUNIOR COLLEGE is the property owner and DENNEY ARCHITECTS INC is the design firm of record. The project was registered with TDLR on November 7, 2015.

Frequently Asked Questions

What is PHASE TWO FINISH OUT?

PHASE TWO FINISH OUT is a renovation/alteration project at 1137 LOOP 301 in Sulphur Springs, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Phase 2 interior finish out with HVAC, electrical and fire protection system expansion.

Is PHASE TWO FINISH OUT open in Sulphur Springs?

Construction on PHASE TWO FINISH OUT is complete — TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.

Where is PHASE TWO FINISH OUT located?

PHASE TWO FINISH OUT is located at 1137 LOOP 301, Sulphur Springs, TX, 75482, in Hopkins County.

Who is the owner or developer of PHASE TWO FINISH OUT?

PARIS JUNIOR COLLEGE is the property owner/developer of record for PHASE TWO FINISH OUT, per its TDLR project registration.

Who is the architect or design firm for PHASE TWO FINISH OUT?

DENNEY ARCHITECTS INC is the design firm of record for PHASE TWO FINISH OUT, according to its TDLR filing.

How much does PHASE TWO FINISH OUT cost and how big is it?

PHASE TWO FINISH OUT has an estimated construction value of $250K, based on its TDLR filing.

Scope of Work

Phase 2 interior finish out with HVAC, electrical and fire protection system expansion.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1137 LOOP 301, Sulphur Springs, TX, 75482

33.14563, -95.56894

Watch all construction in 75482 (Sulphur Springs)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sulphur Springs?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.