WINGTOP
WINGTOP is a renovation/alteration project at 6615 FM 78 Suite 101, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2016). The project has an estimated value of $190K.
๐Project Metrics
TDLR #EABPRJB6804411Project Closed
Project has been completed and closed
WINGTOP is a Renovation/Alteration project located at 6615 FM 78 Suite 101, San Antonio, TX 78244 in San Antonio, Texas. The project has an estimated value of $190K. VALCOR COMMERCIAL REAL ESTATE is the property owner and MICHAEL J. WILKUS ARCHITECT is the design firm of record. The project was registered with TDLR on November 9, 2015.
โFrequently Asked Questions
What is WINGTOP?
WINGTOP is a renovation/alteration project at 6615 FM 78 Suite 101 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant building of an existing shell building.
Is WINGTOP open in San Antonio?
Construction on WINGTOP is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2016. The building is finished and very likely open.
Where is WINGTOP located?
WINGTOP is located at 6615 FM 78 Suite 101, San Antonio, TX, 78244, in Bexar County.
Who is the owner or developer of WINGTOP?
VALCOR COMMERCIAL REAL ESTATE is the property owner/developer of record for WINGTOP, per its TDLR project registration.
Who is the architect or design firm for WINGTOP?
MICHAEL J. WILKUS ARCHITECT is the design firm of record for WINGTOP, according to its TDLR filing.
How much does WINGTOP cost and how big is it?
WINGTOP has an estimated construction value of $190K, based on its TDLR filing.
๐Scope of Work
Tenant building of an existing shell building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 9, 2015
Review Complete
Inspection Complete
Closed
Mar 1, 2016