AISD MENDEZ MS 2013 BOND IMP PACKAGE 2
๐Project Metrics
TDLR #EABPRJB6804710Project Closed
Project has been completed and closed
๐Scope of Work
RENOVATE CTE ENGINEERING/PRODUCTION LABS,FAMILY CONSUMERSCIENCE LAB,RESTROOMS,OUTSIDE AIR UNITS VAR175/APL200
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$800K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater Replace 40-gallon gas water heater in garage
Replace 60 ft of cast iron piping with schedule 40 PVC for drain line under the home. *main sewer line
Replacement of complete existing central heat and air system with or without duct work
***Timed Virtual Inspection: 12/11/2025 @ 9 AM*** Replacement of complete existing central heat and air system with or without duct work