MERIDIAN PHASE V
MERIDIAN PHASE V is a renovation/alteration project at 2550 NORTH MAYS ST, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $6.2M.
๐Project Metrics
TDLR #EABPRJB6804890Project Closed
Project has been completed and closed
MERIDIAN PHASE V is a Renovation/Alteration project located at 2550 NORTH MAYS ST, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $6.2M. KARALEI NUNN is the property owner and STUDIO 8 ARCHITECTS is the design firm of record. The project was registered with TDLR on November 16, 2015.
โFrequently Asked Questions
What is MERIDIAN PHASE V?
MERIDIAN PHASE V is a renovation/alteration project at 2550 NORTH MAYS ST in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out
Is MERIDIAN PHASE V open in Round Rock?
Construction on MERIDIAN PHASE V is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
Where is MERIDIAN PHASE V located?
MERIDIAN PHASE V is located at 2550 NORTH MAYS ST, Round Rock, TX, 78665, in Williamson County.
Who is the owner or developer of MERIDIAN PHASE V?
KARALEI NUNN is the property owner/developer of record for MERIDIAN PHASE V, per its TDLR project registration.
Who is the architect or design firm for MERIDIAN PHASE V?
STUDIO 8 ARCHITECTS is the design firm of record for MERIDIAN PHASE V, according to its TDLR filing.
How much does MERIDIAN PHASE V cost and how big is it?
MERIDIAN PHASE V has an estimated construction value of $6.2M, based on its TDLR filing.
๐Scope of Work
Interior finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 16, 2015
Review Complete
Inspection Complete
Closed
Jul 1, 2016
๐Related Projects
๐คSame Owner
$7.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Third floor unit.
Express: Replace 5 windows
Upgrade main electric service and replace sub panel
Replacement of complete existing central heat and air system with or without duct work
reroof