RENOVATIONS TO DAWSON ELEMENTARY SCHOOL
📊Project Metrics
TDLR #EABPRJB6807523Project Closed
Project has been completed and closed
📋Scope of Work
Replace ground source heat pumps with new rooftop AC units. Work includes roofing structure, electrical, HVAC a
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
🔗Related Projects
📄Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Total Demo of SFR 2250 sqft circa 1954
Sign 3) Install new SF LED ¿CROWN¿ wall sign on drive thru elevation = 3.60¿ x 5.67 = 20.41 SF
Install new set of remote illuminated channel letters to read ¿BURGER KING¿ on side elevation = 1.58¿ x 13.08¿ = 20.67 SF
Sign 6) Install new SF LED ¿CROWN¿ wall sign on drive thru elevation = 3.60¿ x 5.67 = 20.41 SF