Funding type
This project is privately funded, on private land for private use.
ACE DENTAL
100 CARLOS G. PARKER SUITE 110, Taylor, TX, 76574
ACE DENTAL is a renovation/alteration project at 100 CARLOS G. PARKER SUITE 110, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2016). The project has an estimated value of $128K.
- Estimated project value
- $128K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
25 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
90 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76574 (Taylor)
One email per change. Unsubscribe in one click. Privacy.
ACE DENTAL is a Renovation/Alteration project located at 100 CARLOS G. PARKER SUITE 110, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $128K. AC is the property owner and MED TECH is the design firm of record. The project was registered with TDLR on January 7, 2016.
Frequently Asked Questions
What is ACE DENTAL?
ACE DENTAL is a renovation/alteration project at 100 CARLOS G. PARKER SUITE 110 in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REMODEL TO A DENTAL OFFICE.
Is ACE DENTAL open in Taylor?
Construction on ACE DENTAL is complete — TDLR records show the project passed its required accessibility inspection in May 2016. The building is finished and very likely open.
Where is ACE DENTAL located?
ACE DENTAL is located at 100 CARLOS G. PARKER SUITE 110, Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of ACE DENTAL?
AC is the property owner/developer of record for ACE DENTAL, per its TDLR project registration.
Who is the architect or design firm for ACE DENTAL?
MED TECH is the design firm of record for ACE DENTAL, according to its TDLR filing.
How much does ACE DENTAL cost and how big is it?
ACE DENTAL has an estimated construction value of $128K, based on its TDLR filing.
Scope of Work
REMODEL TO A DENTAL OFFICE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
100 CARLOS G. PARKER SUITE 110, Taylor, TX, 76574
Related Projects
Same Owner
$212K totalNearby Projects
Within 1 kmRelated City Permits
Building permits found at or near this location
Exterior electrical service upgrade: Install a new 200-amp meter box. Install a 200-amp main disconnect. Install new service drop cables. Install a new 2-inch rigid conduit for the service drop. Install grounding rods.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res [5 beds 6.5baths].
SP Condo - New Single family residence 3 Bed 2.5 Baths attached 2 car garage covered patio
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3bath] with Covered Porch and Covered Patio. 1003 LINCOLN ST
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3bath]. 1005 LINCOLN ST
Watch all construction in 76574 (Taylor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Taylor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.