BAZAARVOICE - CAFE
BAZAARVOICE - CAFE is a renovation/alteration project at 10901 STONELAKE BLVD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2016). The project has an estimated value of $60K.
๐Project Metrics
TDLR #EABPRJB6807755Project Closed
Project has been completed and closed
BAZAARVOICE - CAFE is a Renovation/Alteration project located at 10901 STONELAKE BLVD., Austin, TX 78759 in Austin, Texas. The project has an estimated value of $60K. NP QUARRY OAKS III LLC is the property owner and LAUCKGROUP is the design firm of record. The project was registered with TDLR on January 8, 2016.
โFrequently Asked Questions
What is BAZAARVOICE - CAFE?
BAZAARVOICE - CAFE is a renovation/alteration project at 10901 STONELAKE BLVD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation
Is BAZAARVOICE - CAFE open in Austin?
Construction on BAZAARVOICE - CAFE is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2016. The building is finished and very likely open.
Where is BAZAARVOICE - CAFE located?
BAZAARVOICE - CAFE is located at 10901 STONELAKE BLVD., Austin, TX, 78759, in Travis County.
Who is the owner or developer of BAZAARVOICE - CAFE?
NP QUARRY OAKS III LLC is the property owner/developer of record for BAZAARVOICE - CAFE, per its TDLR project registration.
Who is the architect or design firm for BAZAARVOICE - CAFE?
LAUCKGROUP is the design firm of record for BAZAARVOICE - CAFE, according to its TDLR filing.
How much does BAZAARVOICE - CAFE cost and how big is it?
BAZAARVOICE - CAFE has an estimated construction value of $60K, based on its TDLR filing.
๐Scope of Work
Interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 8, 2016
Review Complete
Inspection Complete
Closed
Apr 1, 2016
๐Related Projects
๐Related City Permits
Building permits found at or near this location
First time interior build out
Remove (E) kiosk building. Extend length of second drive-thru lane. Add drive-thru Tormax door and team member door. Modify (E) double lane canopy at drive-thru. Modify-extend (E) drive-thru cockpit. Modify (E) order area. Add (N) dishwashing room.
Relocating existing fireline to accommodate site changes/ vehicle routing.
Remove (E) kiosk building. Extend length of second drive-thru lane. Add drive-thru Tormax door and team member door. Modify (E) double lane canopy at drive-thru. Modify-extend (E) drive-thru cockpit. Modify (E) order area. Add (N) dishwashing room.
Remove (E) kiosk building. Extend length of second drive-thru lane. Add drive-thru Tormax door and team member door. Modify (E) double lane canopy at drive-thru. Modify-extend (E) drive-thru cockpit. Modify (E) order area. Add (N) dishwashing room.