Project intelligenceTDLR EABPRJB6808148New Construction
Funding type

This project is privately funded, on private land for private use.

F2 STONE FACTORY

10138 CHICKASAW LANE, Houston, TX, 77401

Target date passed (Oct 2017)Review Complete

F2 STONE FACTORY is a new construction project at 10138 CHICKASAW LANE, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2017 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $700K.

Estimated project value
$700K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 15, 2016654 days across supplied datesOct 30, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    608 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77401 (Houston)

One email per change. Unsubscribe in one click. Privacy.

F2 STONE FACTORY is a New Construction project located at 10138 CHICKASAW LANE, Houston, TX 77401 in Houston, Texas. The project has an estimated value of $700K. RAJA S. SETTIPALI is the property owner and TAYLOR MADE DESIGNS is the design firm of record. The project was registered with TDLR on January 15, 2016.

Frequently Asked Questions

What is F2 STONE FACTORY?

F2 STONE FACTORY is a new construction project at 10138 CHICKASAW LANE in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New office/workshop on new site.

Is F2 STONE FACTORY open in Houston?

F2 STONE FACTORY was scheduled to finish construction in Oct 2017 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is F2 STONE FACTORY located?

F2 STONE FACTORY is located at 10138 CHICKASAW LANE, Houston, TX, 77401, in Harris County.

Who is the owner or developer of F2 STONE FACTORY?

RAJA S. SETTIPALI is the property owner/developer of record for F2 STONE FACTORY, per its TDLR project registration.

Who is the architect or design firm for F2 STONE FACTORY?

TAYLOR MADE DESIGNS is the design firm of record for F2 STONE FACTORY, according to its TDLR filing.

How much does F2 STONE FACTORY cost and how big is it?

F2 STONE FACTORY has an estimated construction value of $700K, based on its TDLR filing.

Scope of Work

New office/workshop on new site.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

10138 CHICKASAW LANE, Houston, TX, 77401

29.85204, -95.54354

Watch all construction in 77401 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.