FSFW REMODEL
FSFW REMODEL is a renovation/alteration project at 170 E. STACY ROAD, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2016). The project has an estimated value of $125K.
๐Project Metrics
TDLR #EABPRJB6810009Project Closed
Project has been completed and closed
FSFW REMODEL is a Renovation/Alteration project located at 170 E. STACY ROAD, Allen, TX 75002 in Allen, Texas. The project has an estimated value of $125K. MG HERRING GROUP is the property owner and MJM ARCHITECTS is the design firm of record. The project was registered with TDLR on February 12, 2016.
โFrequently Asked Questions
What is FSFW REMODEL?
FSFW REMODEL is a renovation/alteration project at 170 E. STACY ROAD in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The work covered by these documents is a limited scope remodel to the first floor of an existing two-story Dick'
Is FSFW REMODEL open in Allen?
Construction on FSFW REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2016. The building is finished and very likely open.
Where is FSFW REMODEL located?
FSFW REMODEL is located at 170 E. STACY ROAD, Allen, TX, 75002, in Collin County.
Who is the owner or developer of FSFW REMODEL?
MG HERRING GROUP is the property owner/developer of record for FSFW REMODEL, per its TDLR project registration.
Who is the architect or design firm for FSFW REMODEL?
MJM ARCHITECTS is the design firm of record for FSFW REMODEL, according to its TDLR filing.
How much does FSFW REMODEL cost and how big is it?
FSFW REMODEL has an estimated construction value of $125K, based on its TDLR filing.
๐Scope of Work
The work covered by these documents is a limited scope remodel to the first floor of an existing two-story Dick'
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 12, 2016
Review Complete
Inspection Complete
Closed
Apr 1, 2016