Project intelligenceTDLR EABPRJB6810910New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR

15601 KOENIG LANE, Conroe, TX, 77384

Construction complete · May 2016Project Closed

STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR is a new construction project at 15601 KOENIG LANE, Conroe, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2016). The project has an estimated value of $450K.

Estimated project value
$450K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 26, 201665 days across supplied datesMay 1, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77384 (Conroe)

One email per change. Unsubscribe in one click. Privacy.

STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR is a New Construction project located at 15601 KOENIG LANE, Conroe, TX 77384 in Conroe, Texas. The project has an estimated value of $450K. PEOPLES ROAD LP C/O GRACEPOINT HOLDING is the property owner and LJA ENGINEERING INC. is the design firm of record. The project was registered with TDLR on February 26, 2016.

Frequently Asked Questions

What is STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR?

STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR is a new construction project at 15601 KOENIG LANE in Conroe, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of brick masonry veneer and columns with concrete base structure on existing culvert headwall. Inst

Is STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR open in Conroe?

Construction on STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR is complete — TDLR records show the project passed its required accessibility inspection in May 2016. The building is finished and very likely open.

Where is STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR located?

STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR is located at 15601 KOENIG LANE, Conroe, TX, 77384, in Montgomery County.

Who is the owner or developer of STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR?

PEOPLES ROAD LP C/O GRACEPOINT HOLDING is the property owner/developer of record for STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR, per its TDLR project registration.

Who is the architect or design firm for STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR?

LJA ENGINEERING INC. is the design firm of record for STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR, according to its TDLR filing.

How much does STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR cost and how big is it?

STILLWATER PHASE 1 BRIDGE HARDSCAPE IMPR has an estimated construction value of $450K, based on its TDLR filing.

Scope of Work

Construction of brick masonry veneer and columns with concrete base structure on existing culvert headwall. Inst

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

15601 KOENIG LANE, Conroe, TX, 77384

30.22612, -95.47847

Watch all construction in 77384 (Conroe)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.