HIGH COTTON HOME & DESIGN
๐Project Metrics
TDLR #EABPRJB6811112Project Closed
Project has been completed and closed
๐Scope of Work
Tenant improvement in existing empty single-story shellbuilding.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Remove (E) kiosk building. Extend length of second drive-thru lane. Add drive-thru Tormax door and team member door. Modify (E) double lane canopy at drive-thru. Modify-extend (E) drive-thru cockpit. Modify (E) order area. Add (N) dishwashing room.
(Reason George) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
2026/03/01| Chinatown Centers Year of the Horse Celebration - Cultural Lunar New Year celebration within the boundaries of our shopping center at 10901 N Lamar Blvd
Tis is a commercial shopping center one of the strips has a transformer that feeds a 36 x36 jbox with tap blocks inside. there are 6 meter banks that have feeder from the tap blocks to each meter then there respective disconnects. One of the A phase has melted insulation due to overload or deterioation of the insulation. This is an emergency requuest due to if the bare phase touches any metal parts and arc fault explosion can take place the likelyhood is high. Please approve this request high priority. I will have to coordinate with Autin Energy to do after hrs. Time sensitive. High danger.
Express- Replace 4 windows like for like.
๐Related Site Plans
City of Austin site plan approvals at this location