1ST FLOOR LOBBY
1ST FLOOR LOBBY is a renovation/alteration project at 13155 NOEL RD, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2016). The project has an estimated value of $1.8M.
๐Project Metrics
TDLR #EABPRJB6811394Project Closed
Project has been completed and closed
1ST FLOOR LOBBY is a Renovation/Alteration project located at 13155 NOEL RD, Dallas, TX 75240 in Dallas, Texas. The project has an estimated value of $1.8M. SPUS7 GALLERIA LP is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on March 4, 2016.
โFrequently Asked Questions
What is 1ST FLOOR LOBBY?
1ST FLOOR LOBBY is a renovation/alteration project at 13155 NOEL RD in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation of existing lobby with new finishes
Is 1ST FLOOR LOBBY open in Dallas?
Construction on 1ST FLOOR LOBBY is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2016. The building is finished and very likely open.
Where is 1ST FLOOR LOBBY located?
1ST FLOOR LOBBY is located at 13155 NOEL RD, Dallas, TX, 75240, in Dallas County.
Who is the owner or developer of 1ST FLOOR LOBBY?
SPUS7 GALLERIA LP is the property owner/developer of record for 1ST FLOOR LOBBY, per its TDLR project registration.
Who is the architect or design firm for 1ST FLOOR LOBBY?
ENTOS DESIGN is the design firm of record for 1ST FLOOR LOBBY, according to its TDLR filing.
How much does 1ST FLOOR LOBBY cost and how big is it?
1ST FLOOR LOBBY has an estimated construction value of $1.8M, based on its TDLR filing.
๐Scope of Work
renovation of existing lobby with new finishes
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 4, 2016
Review Complete
Inspection Complete
Closed
Jun 1, 2016