Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
THOMAS BASEBALL PARK IMPROVEMENTS in Carrollton, TX
1950 N. PERRY ROAD, Carrollton, TX, 75006
THOMAS BASEBALL PARK IMPROVEMENTS is a renovation/alteration project at 1950 N. PERRY ROAD, Carrollton, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $425K.
- Estimated project value
- $425K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
45 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
123 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75006 (Carrollton)
One email per change. Unsubscribe in one click. Privacy.
THOMAS BASEBALL PARK IMPROVEMENTS is a Renovation/Alteration project located at 1950 N. PERRY ROAD, Carrollton, TX 75006 in Carrollton, Texas. The project has an estimated value of $425K. CITY OF CARROLLTON PARKS AND RECREATION is the property owner and LANARC DESIGN INC. is the design firm of record. The project was registered with TDLR on March 17, 2016.
Frequently Asked Questions
What is THOMAS BASEBALL PARK IMPROVEMENTS?
THOMAS BASEBALL PARK IMPROVEMENTS is a renovation/alteration project at 1950 N. PERRY ROAD in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site Improvements, Sidewalk, Parking Lot, Grading, Fencing, Storm sewer, Shade Shelter install, and Landscape.
Is THOMAS BASEBALL PARK IMPROVEMENTS open in Carrollton?
Construction on THOMAS BASEBALL PARK IMPROVEMENTS is complete — TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.
Where is THOMAS BASEBALL PARK IMPROVEMENTS located?
THOMAS BASEBALL PARK IMPROVEMENTS is located at 1950 N. PERRY ROAD, Carrollton, TX, 75006, in Dallas County.
Who is the owner or developer of THOMAS BASEBALL PARK IMPROVEMENTS?
CITY OF CARROLLTON PARKS AND RECREATION is the property owner/developer of record for THOMAS BASEBALL PARK IMPROVEMENTS, per its TDLR project registration.
Who is the architect or design firm for THOMAS BASEBALL PARK IMPROVEMENTS?
LANARC DESIGN INC. is the design firm of record for THOMAS BASEBALL PARK IMPROVEMENTS, according to its TDLR filing.
How much does THOMAS BASEBALL PARK IMPROVEMENTS cost and how big is it?
THOMAS BASEBALL PARK IMPROVEMENTS has an estimated construction value of $425K, based on its TDLR filing.
Scope of Work
Site Improvements, Sidewalk, Parking Lot, Grading, Fencing, Storm sewer, Shade Shelter install, and Landscape.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1950 N. PERRY ROAD, Carrollton, TX, 75006
Related Projects
Watch all construction in 75006 (Carrollton)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Carrollton?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.