SPEC SUITE 250
SPEC SUITE 250 is a renovation/alteration project at 4940 EISENHAUER RD. STE 250, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2016). The project has an estimated value of $166K.
๐Project Metrics
TDLR #EABPRJB6812740Project Closed
Project has been completed and closed
SPEC SUITE 250 is a Renovation/Alteration project located at 4940 EISENHAUER RD. STE 250, San Antonio, TX 78218 in San Antonio, Texas. The project has an estimated value of $166K. PROLOGIS is the property owner and JORDAN GROUP, THE is the design firm of record. The project was registered with TDLR on March 22, 2016.
โFrequently Asked Questions
What is SPEC SUITE 250?
SPEC SUITE 250 is a renovation/alteration project at 4940 EISENHAUER RD. STE 250 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Remodel
Is SPEC SUITE 250 open in San Antonio?
Construction on SPEC SUITE 250 is complete โ TDLR records show the project passed its required accessibility inspection in May 2016. The building is finished and very likely open.
Where is SPEC SUITE 250 located?
SPEC SUITE 250 is located at 4940 EISENHAUER RD. STE 250, San Antonio, TX, 78218, in Bexar County.
Who is the owner or developer of SPEC SUITE 250?
PROLOGIS is the property owner/developer of record for SPEC SUITE 250, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 250?
JORDAN GROUP, THE is the design firm of record for SPEC SUITE 250, according to its TDLR filing.
How much does SPEC SUITE 250 cost and how big is it?
SPEC SUITE 250 has an estimated construction value of $166K, based on its TDLR filing.
๐Scope of Work
Interior Remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 22, 2016
Review Complete
Inspection Complete
Closed
May 1, 2016