Project intelligenceTDLR EABPRJB6812939Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

AISD BP2 PHASE 2

2911 KINGSWOOD DRIVE, Grand Prairie, TX, 75052

Construction complete · Apr 2017Project Closed

AISD BP2 PHASE 2 is a renovation/alteration project at 2911 KINGSWOOD DRIVE, Grand Prairie, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2017). The project has an estimated value of $360K.

Estimated project value
$360K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 25, 2016372 days across supplied datesApr 1, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    282 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    90 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75052 (Grand Prairie)

One email per change. Unsubscribe in one click. Privacy.

AISD BP2 PHASE 2 is a Renovation/Alteration project located at 2911 KINGSWOOD DRIVE, Grand Prairie, TX 75052 in Grand Prairie, Texas. The project has an estimated value of $360K. ARLINGTON INDEPENDENT SCHOOL DISTRICT is the property owner and HAHNFELD HOFFER STANFORD is the design firm of record. The project was registered with TDLR on March 25, 2016.

Frequently Asked Questions

What is AISD BP2 PHASE 2?

AISD BP2 PHASE 2 is a renovation/alteration project at 2911 KINGSWOOD DRIVE in Grand Prairie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1.Security Vestibule: Remove interior storefront at thecurrent vestibule. Add a storefront to create a larger s

Is AISD BP2 PHASE 2 open in Grand Prairie?

Construction on AISD BP2 PHASE 2 is complete — TDLR records show the project passed its required accessibility inspection in Apr 2017. The building is finished and very likely open.

Where is AISD BP2 PHASE 2 located?

AISD BP2 PHASE 2 is located at 2911 KINGSWOOD DRIVE, Grand Prairie, TX, 75052, in Tarrant County.

Who is the owner or developer of AISD BP2 PHASE 2?

ARLINGTON INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for AISD BP2 PHASE 2, per its TDLR project registration.

Who is the architect or design firm for AISD BP2 PHASE 2?

HAHNFELD HOFFER STANFORD is the design firm of record for AISD BP2 PHASE 2, according to its TDLR filing.

How much does AISD BP2 PHASE 2 cost and how big is it?

AISD BP2 PHASE 2 has an estimated construction value of $360K, based on its TDLR filing.

Scope of Work

1.Security Vestibule: Remove interior storefront at thecurrent vestibule. Add a storefront to create a larger s

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2911 KINGSWOOD DRIVE, Grand Prairie, TX, 75052

Location by street address

Watch all construction in 75052 (Grand Prairie)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Grand Prairie?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.