Project intelligenceTDLR EABPRJB6813632Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

RUNGE ISD, RENOVATIONS PHASE 3 & 4

600 N. REIFFERT STREET, Runge, TX, 78151

Construction complete · Aug 2016Project Closed

RUNGE ISD, RENOVATIONS PHASE 3 & 4 is a renovation/alteration project at 600 N. REIFFERT STREET, Runge, in Karnes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2016). The project has an estimated value of $6.4M.

Estimated project value
$6.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 5, 2016118 days across supplied datesAug 1, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78151 (Runge)

One email per change. Unsubscribe in one click. Privacy.

RUNGE ISD, RENOVATIONS PHASE 3 & 4 is a Renovation/Alteration project located at 600 N. REIFFERT STREET, Runge, TX 78151 in Runge, Texas. The project has an estimated value of $6.4M. RUNGE INDEPENDENT SCHOOL DISTRICT is the property owner and SZH ARCHITECTURE is the design firm of record. The project was registered with TDLR on April 5, 2016.

Frequently Asked Questions

What is RUNGE ISD, RENOVATIONS PHASE 3 & 4?

RUNGE ISD, RENOVATIONS PHASE 3 & 4 is a renovation/alteration project at 600 N. REIFFERT STREET in Runge, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Phase 3 & 4 including additions and renovations to the cafeteria and High School buildings and adding new athlet

Is RUNGE ISD, RENOVATIONS PHASE 3 & 4 open in Runge?

Construction on RUNGE ISD, RENOVATIONS PHASE 3 & 4 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2016. The building is finished and very likely open.

Where is RUNGE ISD, RENOVATIONS PHASE 3 & 4 located?

RUNGE ISD, RENOVATIONS PHASE 3 & 4 is located at 600 N. REIFFERT STREET, Runge, TX, 78151, in Karnes County.

Who is the owner or developer of RUNGE ISD, RENOVATIONS PHASE 3 & 4?

RUNGE INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for RUNGE ISD, RENOVATIONS PHASE 3 & 4, per its TDLR project registration.

Who is the architect or design firm for RUNGE ISD, RENOVATIONS PHASE 3 & 4?

SZH ARCHITECTURE is the design firm of record for RUNGE ISD, RENOVATIONS PHASE 3 & 4, according to its TDLR filing.

How much does RUNGE ISD, RENOVATIONS PHASE 3 & 4 cost and how big is it?

RUNGE ISD, RENOVATIONS PHASE 3 & 4 has an estimated construction value of $6.4M, based on its TDLR filing.

Scope of Work

Phase 3 & 4 including additions and renovations to the cafeteria and High School buildings and adding new athlet

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

600 N. REIFFERT STREET, Runge, TX, 78151

28.88824, -97.71180

Watch all construction in 78151 (Runge)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.