Project intelligenceTDLR EABPRJB6814107Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

PHASE-1 SHELL BUILDING INPROVEMENTS

3610 STAGG DRIVE, Beaumont, TX, 77701

Construction complete · Sep 2016Project Closed

PHASE-1 SHELL BUILDING INPROVEMENTS is a renovation/alteration project at 3610 STAGG DRIVE, Beaumont, in Jefferson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $275K.

Estimated project value
$275K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 12, 2016142 days across supplied datesSep 1, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    123 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77701 (Beaumont)

One email per change. Unsubscribe in one click. Privacy.

PHASE-1 SHELL BUILDING INPROVEMENTS is a Renovation/Alteration project located at 3610 STAGG DRIVE, Beaumont, TX 77701 in Beaumont, Texas. The project has an estimated value of $275K. LOMBARD GROUP TEXAS LLC. is the property owner and LEVINSON ALCOSER ASSOCIATES LP is the design firm of record. The project was registered with TDLR on April 12, 2016.

Frequently Asked Questions

What is PHASE-1 SHELL BUILDING INPROVEMENTS?

PHASE-1 SHELL BUILDING INPROVEMENTS is a renovation/alteration project at 3610 STAGG DRIVE in Beaumont, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restore framing to existing 3,741sf lease space. Removeexisting failing siding and provide new exterior stucco

Is PHASE-1 SHELL BUILDING INPROVEMENTS open in Beaumont?

Construction on PHASE-1 SHELL BUILDING INPROVEMENTS is complete — TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.

Where is PHASE-1 SHELL BUILDING INPROVEMENTS located?

PHASE-1 SHELL BUILDING INPROVEMENTS is located at 3610 STAGG DRIVE, Beaumont, TX, 77701, in Jefferson County.

Who is the owner or developer of PHASE-1 SHELL BUILDING INPROVEMENTS?

LOMBARD GROUP TEXAS LLC. is the property owner/developer of record for PHASE-1 SHELL BUILDING INPROVEMENTS, per its TDLR project registration.

Who is the architect or design firm for PHASE-1 SHELL BUILDING INPROVEMENTS?

LEVINSON ALCOSER ASSOCIATES LP is the design firm of record for PHASE-1 SHELL BUILDING INPROVEMENTS, according to its TDLR filing.

How much does PHASE-1 SHELL BUILDING INPROVEMENTS cost and how big is it?

PHASE-1 SHELL BUILDING INPROVEMENTS has an estimated construction value of $275K, based on its TDLR filing.

Scope of Work

Restore framing to existing 3,741sf lease space. Removeexisting failing siding and provide new exterior stucco

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3610 STAGG DRIVE, Beaumont, TX, 77701

Location by street address

Watch all construction in 77701 (Beaumont)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Beaumont?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.