CP613853 JGB: RENOVATE LAB-NICOLA TISATO is a renovation/alteration project at 2305 SPEEDWAY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $439K.
Final inspection completed, awaiting project closure
CP613853 JGB: RENOVATE LAB-NICOLA TISATO is a Renovation/Alteration project located at 2305 SPEEDWAY, Austin, TX 78705 in Austin, Texas. The project has an estimated value of $439K. UNIVERSITY OF TEXAS AT AUSTIN, THE is the property owner and PARSONS ENVIRONMENTAL & INFRASTR GROUP is the design firm of record. The project was registered with TDLR on April 29, 2016.
CP613853 JGB: RENOVATE LAB-NICOLA TISATO is a renovation/alteration project at 2305 SPEEDWAY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1-2 LAB SPACES; ROCK DEFORMATION LAB (RDL) (300 SF) WITHCOMPRESSED AIR, WATER (INCLUDING WATER FOR COOLING SYST
Construction on CP613853 JGB: RENOVATE LAB-NICOLA TISATO is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.
CP613853 JGB: RENOVATE LAB-NICOLA TISATO is located at 2305 SPEEDWAY, Austin, TX, 78705, in Travis County.
UNIVERSITY OF TEXAS AT AUSTIN, THE is the property owner/developer of record for CP613853 JGB: RENOVATE LAB-NICOLA TISATO, per its TDLR project registration.
PARSONS ENVIRONMENTAL & INFRASTR GROUP is the design firm of record for CP613853 JGB: RENOVATE LAB-NICOLA TISATO, according to its TDLR filing.
CP613853 JGB: RENOVATE LAB-NICOLA TISATO has an estimated construction value of $439K, based on its TDLR filing.
1-2 LAB SPACES; ROCK DEFORMATION LAB (RDL) (300 SF) WITHCOMPRESSED AIR, WATER (INCLUDING WATER FOR COOLING SYST
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 29, 2016
Review Complete
Inspection Complete
Dec 1, 2016
Closed
Building permits found at or near this location
Replace sewer yard line from house connection to City tap.
Replacement of complete existing central heat and air system with or without duct work 1 system: 3 Ton 16 Seer2 Two Stage Condenser 90% furnace and evaporator coil
Temporary power loop
2305 Rae Dell Ave 2 Story New residential duplex construction with attached carport and covered patio 4/3
2305 Rae Dell Ave 2 Story New residential duplex construction with attached carport and covered patio 4/3