BUILDING EAST in West Lake Hills, TX
8701 F.M. 2244, BEECAVE ROAD, West Lake Hills, TX, 78746
BUILDING EAST is a new construction project at 8701 F.M. 2244, BEECAVE ROAD, West Lake Hills, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2020). The project has an estimated value of $28.6M.
- Estimated project value
- $28.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
83 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
1,369 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78746 (West Lake Hills)
One email per change. Unsubscribe in one click. Privacy.
BUILDING EAST is a New Construction project located at 8701 F.M. 2244, BEECAVE ROAD, West Lake Hills, TX 78746 in West Lake Hills, Texas. The project has an estimated value of $28.6M. SEVEN OAKS RE LP is the property owner and GDA ARCHITECTS LLP is the design firm of record. The project was registered with TDLR on May 10, 2016.
Frequently Asked Questions
What is BUILDING EAST?
BUILDING EAST is a new construction project at 8701 F.M. 2244, BEECAVE ROAD in West Lake Hills, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONSTRUCTION OF NEW FIVE LEVEL OFFICE SHELL BUILDING OVER ONE LEVEL PARKING GARAGE AND A SEPARATE SIX TIER PARKI
Is BUILDING EAST open in West Lake Hills?
Construction on BUILDING EAST is complete — TDLR records show the project passed its required accessibility inspection in May 2020. The building is finished and very likely open.
Where is BUILDING EAST located?
BUILDING EAST is located at 8701 F.M. 2244, BEECAVE ROAD, West Lake Hills, TX, 78746, in Travis County.
Who is the owner or developer of BUILDING EAST?
SEVEN OAKS RE LP is the property owner/developer of record for BUILDING EAST, per its TDLR project registration.
Who is the architect or design firm for BUILDING EAST?
GDA ARCHITECTS LLP is the design firm of record for BUILDING EAST, according to its TDLR filing.
How much does BUILDING EAST cost and how big is it?
BUILDING EAST has an estimated construction value of $28.6M, based on its TDLR filing.
Scope of Work
CONSTRUCTION OF NEW FIVE LEVEL OFFICE SHELL BUILDING OVER ONE LEVEL PARKING GARAGE AND A SEPARATE SIX TIER PARKI
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
8701 F.M. 2244, BEECAVE ROAD, West Lake Hills, TX, 78746
Related Projects
Same Design Firm
$1.03B totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work whiddon
12x25 Pool with autofill NG heater and ASTM F1346 Automatic safety cover.
200amp main panel and main service replacement adding grounding system and surge protection. AE is the electrical provider.
Replace approximately 60 linear feet of existing underground water service line from the street-side connection to the house including trenching in the front yard and removal of up to 5 linear feet of driveway concrete. Repipe the entire homes water distribution system with PEX routed through the attic. Work includes piping for two bathrooms one kitchen one ice maker box one washing machine connection and one water heater plus new fixture shutoff valves and three hose bibs. Replace the existing water heater and correct installation deficiencies. Install a new drain pan with drain piping to the exterior temperature and pressure relief discharge piping and a thermal expansion tank. Pressure test new water piping and complete required inspections.
Replacement of complete existing central heat and air system with or without duct work
Related Site Plans
City of Austin site plan approvals at this location
Watch all construction in 78746 (West Lake Hills)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in West Lake Hills?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.