Construction complete ยท Nov 2016๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

HOLLISTER CO.

2901 S. CAPITAL OF TEXAS HIGHW Space R05, Austin, TX 78746, Austin, TX, 78746

HOLLISTER CO. is a renovation/alteration project at 2901 S. CAPITAL OF TEXAS HIGHW Space R05, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2016). The project has an estimated value of $172K.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB6820586
$172K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
1 months
Duration
Registered:Jul 14, 2016
Start:Oct 1, 2016
Target:Nov 1, 2016
๐Ÿ

Project Closed

Project has been completed and closed

HOLLISTER CO. is a Renovation/Alteration project located at 2901 S. CAPITAL OF TEXAS HIGHW Space R05, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $172K. SIMON PROPERTY GROUP is the property owner and WILLIAM E. ABBOT-ARCHITECT is the design firm of record. The project was registered with TDLR on July 14, 2016.

โ“Frequently Asked Questions

What is HOLLISTER CO.?

HOLLISTER CO. is a renovation/alteration project at 2901 S. CAPITAL OF TEXAS HIGHW Space R05 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor interior remodel. Work to include partition removal, rework ceiling, relocate cabinetry, replace finishes

Is HOLLISTER CO. open in Austin?

Construction on HOLLISTER CO. is complete โ€” TDLR records show the project passed its required accessibility inspection in Nov 2016. The building is finished and very likely open.

Where is HOLLISTER CO. located?

HOLLISTER CO. is located at 2901 S. CAPITAL OF TEXAS HIGHW Space R05, Austin, TX, 78746, in Travis County.

Who is the owner or developer of HOLLISTER CO.?

SIMON PROPERTY GROUP is the property owner/developer of record for HOLLISTER CO., per its TDLR project registration.

Who is the architect or design firm for HOLLISTER CO.?

WILLIAM E. ABBOT-ARCHITECT is the design firm of record for HOLLISTER CO., according to its TDLR filing.

How much does HOLLISTER CO. cost and how big is it?

HOLLISTER CO. has an estimated construction value of $172K, based on its TDLR filing.

๐Ÿ“‹Scope of Work

Minor interior remodel. Work to include partition removal, rework ceiling, relocate cabinetry, replace finishes

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 14, 2016
Project Closed
November 1, 2016
Construction Start
October 1, 2016
Expected Completion
November 1, 2016

๐Ÿ“…Project Timeline

Filed

Jul 14, 2016

Review Complete

Inspection Complete

Closed

Nov 1, 2016

๐Ÿ“Location & Views

Open in MapsGet Directions|30.25607, -97.81049

๐Ÿ“„Related City Permits

Building permits found at or near this location

2901 S CAPITAL OF TEXAS HWY NB
0.24 mi away

Per Austin Water we will be installing a backflow prevention device not an RPZ. The installation location in in the dock area near Scarborough and AMC Theaters

ActivePlumbing PermitRepairJun 2026
View Details
2026-075970 PP
๐Ÿ”งTouchstone Plumbing Inc.
2901 S CAPITAL OF TEXAS HWY NB BLDG MO2A
0.24 mi away

Retrofit of an existing tenant fit out. Work includes new and relocated sales floor fixtures floor finish replacement and minor electrical work. Existing Sephora.

ActiveBuilding PermitRemodelJun 2026
View Details
2026-071827 BP
๐Ÿ”งApex Imaging Services
2901 S CAPITAL OF TEXAS HWY NB
0.24 mi away

In order to install two new customer provided 2500 gallon grease traps a 12 x 10 area of concrete will be removed. This area will be excavated up to 12 in depth. The new grease traps will be installed per manufacture requirements and inspected by the City of Austin. The system will be connected to the existing inlet and outlet piping. Once the new system is in use the existing trap will be pumped cleaned and filled in with pea gravel and topped with concrete.

ActivePlumbing PermitGrease Interceptor (GI) replacementJun 2026
View Details
2026-064529 PP
๐Ÿ”งLas Colinas Plumbing
2901 CHERRY LN
3.47 mi away

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

ActiveMechanical PermitChange OutJun 2026
View Details
2026-079269 MP
๐Ÿ”งRadiant Plumbing and Air Conditioning
2901 N IH 35 SVRD NB

Individual front lit channel letters reading TJ Maxx on west elevation

ActiveElectrical PermitWallJun 2026
View Details
2026-074289 EP

Quick Actions

TDLR ID: EABPRJB6820586

Design Firm

๐Ÿ“Š

Travis County Economy

3.5%
Unemployment
$529K
Median Listing
15,059
Bldg Permits/yr
1.4M
Population
6,332
Active Listings
$97K
Median Income
Source: FRED ยท Updated May 2026
County projects โ†’

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists