Project intelligenceTDLR EABPRJB6821659New Construction
Funding type

This project is privately funded, on private land for private use.

TAKE 5 OIL CHANGE

651 ALTA MERE DRIVE, Fort Worth, TX, 76114

Construction complete · Dec 2016Project Closed

TAKE 5 OIL CHANGE is a new construction project at 651 ALTA MERE DRIVE, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $286K.

Estimated project value
$286K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 29, 2016125 days across supplied datesDec 1, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76114 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

TAKE 5 OIL CHANGE is a New Construction project located at 651 ALTA MERE DRIVE, Fort Worth, TX 76114 in Fort Worth, Texas. The project has an estimated value of $286K. TAKE 5 OIL CHANGE is the property owner and RICHMOND GROUP is the design firm of record. The project was registered with TDLR on July 29, 2016.

Frequently Asked Questions

What is TAKE 5 OIL CHANGE?

TAKE 5 OIL CHANGE is a new construction project at 651 ALTA MERE DRIVE in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct a 3 bay oil changing facility. Customers remain in vehicle while oil change is being completed. Wood

Is TAKE 5 OIL CHANGE open in Fort Worth?

Construction on TAKE 5 OIL CHANGE is complete — TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.

Where is TAKE 5 OIL CHANGE located?

TAKE 5 OIL CHANGE is located at 651 ALTA MERE DRIVE, Fort Worth, TX, 76114, in Tarrant County.

Who is the owner or developer of TAKE 5 OIL CHANGE?

TAKE 5 OIL CHANGE is the property owner/developer of record for TAKE 5 OIL CHANGE, per its TDLR project registration.

Who is the architect or design firm for TAKE 5 OIL CHANGE?

RICHMOND GROUP is the design firm of record for TAKE 5 OIL CHANGE, according to its TDLR filing.

How much does TAKE 5 OIL CHANGE cost and how big is it?

TAKE 5 OIL CHANGE has an estimated construction value of $286K, based on its TDLR filing.

Scope of Work

Construct a 3 bay oil changing facility. Customers remain in vehicle while oil change is being completed. Wood

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

651 ALTA MERE DRIVE, Fort Worth, TX, 76114

32.74951, -97.43205

Watch all construction in 76114 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.