Project intelligenceTDLR EABPRJB6821753Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

MHSE HOSPITAL KITCHEN FINISH UPGRADES

11800 ASTORIA BLVD., Houston, TX, 77024

Construction complete · Sep 2018Project Closed

MHSE HOSPITAL KITCHEN FINISH UPGRADES is a renovation/alteration project at 11800 ASTORIA BLVD., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $239K.

Estimated project value
$239K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 1, 2016790 days across supplied datesSep 30, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    759 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77024 (Houston)

One email per change. Unsubscribe in one click. Privacy.

MHSE HOSPITAL KITCHEN FINISH UPGRADES is a Renovation/Alteration project located at 11800 ASTORIA BLVD., Houston, TX 77024 in Houston, Texas. The project has an estimated value of $239K. MEMORIAL HERMANN SE HOSPITAL is the property owner and BSA-ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on August 1, 2016.

Frequently Asked Questions

What is MHSE HOSPITAL KITCHEN FINISH UPGRADES?

MHSE HOSPITAL KITCHEN FINISH UPGRADES is a renovation/alteration project at 11800 ASTORIA BLVD. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4,620 SQFT Interior Finish Upgrades of existing first floor kitchen and Dishwashing Area.

Is MHSE HOSPITAL KITCHEN FINISH UPGRADES open in Houston?

Construction on MHSE HOSPITAL KITCHEN FINISH UPGRADES is complete — TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.

Where is MHSE HOSPITAL KITCHEN FINISH UPGRADES located?

MHSE HOSPITAL KITCHEN FINISH UPGRADES is located at 11800 ASTORIA BLVD., Houston, TX, 77024, in Harris County.

Who is the owner or developer of MHSE HOSPITAL KITCHEN FINISH UPGRADES?

MEMORIAL HERMANN SE HOSPITAL is the property owner/developer of record for MHSE HOSPITAL KITCHEN FINISH UPGRADES, per its TDLR project registration.

Who is the architect or design firm for MHSE HOSPITAL KITCHEN FINISH UPGRADES?

BSA-ARCHITECTS INC. is the design firm of record for MHSE HOSPITAL KITCHEN FINISH UPGRADES, according to its TDLR filing.

How much does MHSE HOSPITAL KITCHEN FINISH UPGRADES cost and how big is it?

MHSE HOSPITAL KITCHEN FINISH UPGRADES has an estimated construction value of $239K, based on its TDLR filing.

Scope of Work

4,620 SQFT Interior Finish Upgrades of existing first floor kitchen and Dishwashing Area.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

11800 ASTORIA BLVD., Houston, TX, 77024

29.58359, -95.20864

Related City Permits

Building permits found at or near this location

11800 ASTORIA BLVD FL 2, Houston, TX 77089

800 SF. HOSPITAL EQUIPMENT REMODEL 1-4-1-I2-A 2021 IBC SPK/FA

IssuedBuilding PmtJun 2026
HOU-26024625-BUILDINGPMT

Watch all construction in 77024 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.