Project intelligenceTDLR EABPRJB6821852Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

HIGH SCHOOL & STADIUM RENOVAITON in New Braunfels, TX

2551 LOOP 337, New Braunfels, TX, 78310

Construction complete · Sep 2017Project Closed

HIGH SCHOOL & STADIUM RENOVAITON is a renovation/alteration project at 2551 LOOP 337, New Braunfels, in Comal County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2017). The project has an estimated value of $8.1M.

Estimated project value
$8.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 2, 2016395 days across supplied datesSep 1, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78310 (New Braunfels)

One email per change. Unsubscribe in one click. Privacy.

HIGH SCHOOL & STADIUM RENOVAITON is a Renovation/Alteration project located at 2551 LOOP 337, New Braunfels, TX 78310 in New Braunfels, Texas. The project has an estimated value of $8.1M. NEW BRAUNFELS ISD is the property owner and STANTEC is the design firm of record. The project was registered with TDLR on August 2, 2016.

Frequently Asked Questions

What is HIGH SCHOOL & STADIUM RENOVAITON?

HIGH SCHOOL & STADIUM RENOVAITON is a renovation/alteration project at 2551 LOOP 337 in New Braunfels, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Entrance canopy replacement, roof replacement, sidewalkreplacement, restroom renovation, ticket booth replaceme

Is HIGH SCHOOL & STADIUM RENOVAITON open in New Braunfels?

Construction on HIGH SCHOOL & STADIUM RENOVAITON is complete — TDLR records show the project passed its required accessibility inspection in Sep 2017. The building is finished and very likely open.

Where is HIGH SCHOOL & STADIUM RENOVAITON located?

HIGH SCHOOL & STADIUM RENOVAITON is located at 2551 LOOP 337, New Braunfels, TX, 78310, in Comal County.

Who is the owner or developer of HIGH SCHOOL & STADIUM RENOVAITON?

NEW BRAUNFELS ISD is the property owner/developer of record for HIGH SCHOOL & STADIUM RENOVAITON, per its TDLR project registration.

Who is the architect or design firm for HIGH SCHOOL & STADIUM RENOVAITON?

STANTEC is the design firm of record for HIGH SCHOOL & STADIUM RENOVAITON, according to its TDLR filing.

How much does HIGH SCHOOL & STADIUM RENOVAITON cost and how big is it?

HIGH SCHOOL & STADIUM RENOVAITON has an estimated construction value of $8.1M, based on its TDLR filing.

Scope of Work

Entrance canopy replacement, roof replacement, sidewalkreplacement, restroom renovation, ticket booth replaceme

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2551 LOOP 337, New Braunfels, TX, 78310

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78310 (New Braunfels)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in New Braunfels?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.