TWC PERFORMANCE is a renovation/alteration project at 17937 I45 SOUTH SUITE 105, Shenandoah, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $90K.
๐Project Metrics
TDLR #EABPRJB7800686Inspection Complete
Final inspection completed, awaiting project closure
TWC PERFORMANCE is a Renovation/Alteration project located at 17937 I45 SOUTH SUITE 105, Shenandoah, TX 77385 in Shenandoah, Texas. The project has an estimated value of $90K. SAM MOON GROUP is the property owner and TWANG DESIGN LLC is the design firm of record. The project was registered with TDLR on September 13, 2016.
โFrequently Asked Questions
What is TWC PERFORMANCE?
TWC PERFORMANCE is a renovation/alteration project at 17937 I45 SOUTH SUITE 105 in Shenandoah, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: DEMO EXISTING CEILING,FLOOR,WALL AND REMODEL FINISH OUT.
Is TWC PERFORMANCE open in Shenandoah?
Construction on TWC PERFORMANCE is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.
Where is TWC PERFORMANCE located?
TWC PERFORMANCE is located at 17937 I45 SOUTH SUITE 105, Shenandoah, TX, 77385, in Montgomery County.
Who is the owner or developer of TWC PERFORMANCE?
SAM MOON GROUP is the property owner/developer of record for TWC PERFORMANCE, per its TDLR project registration.
Who is the architect or design firm for TWC PERFORMANCE?
TWANG DESIGN LLC is the design firm of record for TWC PERFORMANCE, according to its TDLR filing.
How much does TWC PERFORMANCE cost and how big is it?
TWC PERFORMANCE has an estimated construction value of $90K, based on its TDLR filing.
๐Scope of Work
DEMO EXISTING CEILING,FLOOR,WALL AND REMODEL FINISH OUT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 13, 2016
Review Complete
Inspection Complete
Dec 1, 2016
Closed