Project intelligenceTDLR EABPRJB7800923Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BOYD HIGH SCHOOL LIVING ROOF ADDITION

600 N. LAKE FOREST, Mckinney, TX, 75071

Construction complete · Sep 2017Project Closed

BOYD HIGH SCHOOL LIVING ROOF ADDITION is a additions to existing building project at 600 N. LAKE FOREST, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2017). The project has an estimated value of $456K.

Estimated project value
$456K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 16, 2016350 days across supplied datesSep 1, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    258 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75071 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

BOYD HIGH SCHOOL LIVING ROOF ADDITION is a Additions to Existing Building project located at 600 N. LAKE FOREST, Mckinney, TX 75071 in Mckinney, Texas. The project has an estimated value of $456K. MISD is the property owner and SEVEN.D-FOUR ARCHITECTURE is the design firm of record. The project was registered with TDLR on September 16, 2016.

Frequently Asked Questions

What is BOYD HIGH SCHOOL LIVING ROOF ADDITION?

BOYD HIGH SCHOOL LIVING ROOF ADDITION is a additions to existing building project at 600 N. LAKE FOREST in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New addition of an exterior roof deck accessible from 24floor of existing bldg.

Is BOYD HIGH SCHOOL LIVING ROOF ADDITION open in Mckinney?

Construction on BOYD HIGH SCHOOL LIVING ROOF ADDITION is complete — TDLR records show the project passed its required accessibility inspection in Sep 2017. The building is finished and very likely open.

Where is BOYD HIGH SCHOOL LIVING ROOF ADDITION located?

BOYD HIGH SCHOOL LIVING ROOF ADDITION is located at 600 N. LAKE FOREST, Mckinney, TX, 75071, in Collin County.

Who is the owner or developer of BOYD HIGH SCHOOL LIVING ROOF ADDITION?

MISD is the property owner/developer of record for BOYD HIGH SCHOOL LIVING ROOF ADDITION, per its TDLR project registration.

Who is the architect or design firm for BOYD HIGH SCHOOL LIVING ROOF ADDITION?

SEVEN.D-FOUR ARCHITECTURE is the design firm of record for BOYD HIGH SCHOOL LIVING ROOF ADDITION, according to its TDLR filing.

How much does BOYD HIGH SCHOOL LIVING ROOF ADDITION cost and how big is it?

BOYD HIGH SCHOOL LIVING ROOF ADDITION has an estimated construction value of $456K, based on its TDLR filing.

Scope of Work

New addition of an exterior roof deck accessible from 24floor of existing bldg.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

600 N. LAKE FOREST, Mckinney, TX, 75071

Location by street address

Watch all construction in 75071 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.