BB'S AT SUMMIT is a additions to existing building project at 1502 RIVERY BLVD., BLDG. 2 SUITE 2105, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2017). The project has an estimated value of $180K.
Project has been completed and closed
BB'S AT SUMMIT is a Additions to Existing Building project located at 1502 RIVERY BLVD., BLDG. 2 SUITE 2105, Georgetown, TX 78628 in Georgetown, Texas. The project has an estimated value of $180K. BRAE GROUP LTD is the property owner. The project was registered with TDLR on October 12, 2016.
BB'S AT SUMMIT is a additions to existing building project at 1502 RIVERY BLVD., BLDG. 2 SUITE 2105 in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project will take place in a 'shell building'. It will be a restaurant.
Construction on BB'S AT SUMMIT is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2017. The building is finished and very likely open.
BB'S AT SUMMIT is located at 1502 RIVERY BLVD., BLDG. 2 SUITE 2105, Georgetown, TX, 78628, in Williamson County.
BRAE GROUP LTD is the property owner/developer of record for BB'S AT SUMMIT, per its TDLR project registration.
BB'S AT SUMMIT has an estimated construction value of $180K, based on its TDLR filing.
This project will take place in a 'shell building'. It will be a restaurant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 12, 2016
Review Complete
Inspection Complete
Closed
Apr 1, 2017
Building permits found at or near this location
New two-story SFR *PRODUCTION BUILDER* with attached garage and covered porch 4/3.5
New two-story SFR *PRODUCTION BUILDER* with attached garage and covered porch 4/3.5
Replacement of complete existing central heat and air system with or without duct work Johnny Ray
BLDG 19 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
Replacement of complete existing central heat and air system with or without duct work